My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task99-2_CDSSMapViewerRequirements_20060928
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task99-2_CDSSMapViewerRequirements_20060928
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:05:19 AM
Creation date
6/6/2008 11:13:40 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 99.2 - CDSS Map Viewer Requirements
Description
This memorandum addresses Task 99 – GIS Support and Data Maintenance, Subtask 99.2 - Modify and Maintain GIS Tools. Specifically, this memo defines a list of possible upgrades and enhancements for the CDSS Map Viewer.
Decision Support - Doc Type
Task Memorandum
Date
9/28/2006
DSS Category
GIS
DSS
South Platte
Basin
South Platte
Contract/PO #
C153960
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• In addition to the existing layer of 1:24,000 scanned topographic maps (DRG), add 1:100,000 and <br />1:250,000 layers. <br />• Implement map tips for selected layers. The layer will be determined by the State per users <br />feedback. <br />• Display attribute data in pop-up windows instead of in the text frame to allow a bigger viewing <br />area for attribute tables. <br />• Fix a problem where the shaded relief layer does not print in the map layout. <br />3. Comments and Concerns <br />Requirements were implemented as approved and prioritized by State subject to Phase 3 budget. The <br />implemented requirements are described in a separate Subtask 99.2 memo (Memo 2 of 2). It is <br />recommended that requirements that were not implemented in Phase 3 should be implemented in Phase 4 <br />of the project if possible. <br />Page z of z ~RlYerslde Technology, lnc. <br />Wale.• Aesourre.s Ere~rnce: ~nq un~i Cn~sutlmg <br />
The URL can be used to link to this page
Your browser does not support the video tag.