My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_Task91_MapIrrigationDistributionSystems_20070109
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_Task91_MapIrrigationDistributionSystems_20070109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2013 10:03:19 AM
Creation date
6/5/2008 1:08:53 PM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Task 91 - Map Wells, Irrigations Systems and Irrigation Service Areas
Description
This memorandum summarizes the procedures for the 2001 irrigated parcel mapping prepared under Task 91 – Map Wells, Irrigation Systems, and Irrigation Service Areas.
Decision Support - Doc Type
Task Memorandum
Date
1/9/2007
DSS Category
GIS
DSS
South Platte
Basin
South Platte
Contract/PO #
C153960
Grant Type
Non-Reimbursable
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
Riverside Technology inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMO -TASK 91 <br />2.4 Water Users and Water Commissioners Meetings <br />Meetings with water users were held to obtain and verify information on irrigated parcel boundaries, <br />ditches and diversion structures, water source, and crop type. This information was used to help match <br />wells to irrigated parcels as described in the previous Section 2.3. Figure 6 shows a flowchart of the <br />approach taken in meetings with water users. The verification procedure used in District 47 varied <br />slightly from the procedure for Division 1. The District 47 procedure which used extensive inputs and <br />expertise from the Water Commissioners is documented in Appendix H. <br /> ^ Diversions <br />Generate Irrigation Wells <br />Hardcopy maps of irrigated parcels Ditches <br /> ^ Hydrography <br /> ^ Irrigated <br /> Meet With Water Commissioners Parcels <br />~ Review maps and obtain contact Service Areas <br /> information for ditch companies Orthophotos <br />Contact and Meet with Ditch <br />Companies <br />Explain purpose of project and review <br />maps of irrigation service area, irrigated <br />parcels, ditches, and diversions <br />Edit Maps <br />Make corrections to parcels and service <br />areas with input from meetings and check <br />edits with notes and maps <br /> <br />Review and Final Mapping <br />Figure 6. Approach to Water User Meetings <br />2.4.1 Generate Hardcopy Draft Maps <br />Draft maps were printed for the irrigation meetings with water users. The draft maps showed irrigation <br />diversion structures, delineated parcels by service area, crop type, water source, service area boundaries, <br />and well locations overlaid on either USGS DRG or DOQQ imagery. The draft maps were printed at <br />1:40,000-scale. A map at a smaller scale was printed for ditch companies requiring more detail. <br />2.4.2 Meet with Water Commissioners <br />Water commissioners were contacted to obtain information about active irrigation systems and contact <br />information for ditch companies in their district. All of the water commissioners in Division 1 met with <br />RTi. The meetings consisted of reviewing all the irrigation service areas in the District to understand the <br />entire system at a broad scale. The water commissioners reviewed diversion structures, irrigated parcels, <br />service area boundaries, water source, and crop type. Their input was essential in understanding system <br />operations and creating a preliminary draft product. <br />Page 7 of 55 ~R~versfde FecAno[o`(!~Y fnc. <br />4'JaYer Resources Errgi~ecr:np an~i L~ar+suFlrnd <br />
The URL can be used to link to this page
Your browser does not support the video tag.