My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01779 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01779 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2012 10:49:02 AM
Creation date
5/12/2008 7:53:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153723
Contractor Name
Orchard Mesa Irrigation District
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l . <br /> <br />16. Copy of easements granted to aMID by owners of land over which MML <br />traverses. <br /> <br />~~ V/II/D <br /> <br />-: <br /> <br />17. Copy of the mitigation proposal for MML submitted to Colorado Water (&J)5 J <br />Conservation Soard by aMID. e=Jf/. ttJIL,/\ ;Z:-e?,4k ~ <br /> <br />18. Copy of the mitigation proposal for MML submitted to Wildlife Commission and <br />Division of Wildlife by aMID. ~ ~w <br /> <br />19. Copy of the Agricultural Project Description completed by aMID for the MML V <br />project. <br /> <br />20. Copy of the construction fund loan application completed by aMID for the MML V <br />project. <br /> <br />/ <br />21.lf approved by CWCS, a copy of the construction fund loan contract. <br /> <br />22. Copy of the long term loan contract between CWCS and aMID. 1// <br />. Will this long term loan incorporate the construction loan, or will it be in <br />addition to the construction loan? <br /> <br />23. Copy of any/all alternatives developed by aMID for the MML project. These <br />alternatives must include: <br />. MML project outputs or yields; <br />. MML project yield expressed as the incremental difference in water supply <br />with and without the project; <br />. project costs including capital costs, operation and maintenance costs, total <br />annual costs and costs per unit including the estimate of total capital costs <br />total and annual operation, maintenance and repair costs; <br />. outline of potential financing arrangements; <br />. total annual cost for each alternative; <br />. cost per unit obtained by dividing annual cost by estimated annual output for <br />each alternative; <br />. impacts on the man made environment and the natural environment, and <br />existing social structure; <br />. financial feasibility of the project as measured by aMID's ability all <br />reimbursable costs; <br />. institutional requirements for MML project implementation of special technical <br />problems which should be taken into consideration. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.