<br />3) Status of Preliminary Draft FRlEIS <br />. Gary Drendel (Tetra Tech) reminded the attendees that Chapters 1, 2, and <br />3, as well as all tables and maps, are now posted on the FTP. If anyone is <br />missing anything let Gary know. <br />. Chapter 4 is still receiving some updates related to the topographic issues <br />and it should be out by the end of next week. The chapter will go to Eric <br />and then be rolled out to Cooperators. <br />. Tetra Tech received comments back late last week from Gene Sturm <br />(CO E) on Chapter 5. Chuck Hillerson (Tetra Tech) is addressing the <br />comments now. Gary thinks that this Chapter will be available for the <br />Corps' review in a couple of weeks. <br />. The summary conclusions on Chapter 7 will roll out as soon as possible- <br />it is a fairly brief chapter. This will go to the Corps and then the <br />Cooperators. <br />. March 31 was decided on as the deadline to have Tetra Tech give <br />Chapters 4 and 5 to the COE for review. Eric said that the COE will have <br />them reviewed in one week and should have comments back to Tetra <br />Tech by mid-April. Pending the Corps' review, the 3rd week of April is the <br />goal for Tetra Tech to have Chapters 4 and 5 out to Cooperators. Rick <br />said that the Cooperators will plan on having review comments on these <br />chapters back to the COE by mid-May. <br />. Comments on all Chapters need to be wrapped into a preliminary <br />document by the end of May so that the Independent Technical Review <br />(ITR) team can review it. From there it will go to the AFB. <br />. The end of March is the target for the Mitigation Plan to be ready for <br />review. Tom Ryon (Otter Tail Environmental) and Steve Dougherty (ERO <br />Resources) agreed that the Plan could be ready in this timeframe. <br />. Dave added that the quicker Chapters 4 and 5 get out to Cooperators for <br />review the quicker the State can comment on all the chapters-he warned <br />that it will be a tight turnaround for his agency. <br />. Tom B. asked Gary about the status of the appendices. Gary said all but <br />the Conceptual Mitigation Plan are basically complete. Eric suggested <br />that all the completed appendices could be put on the FTP site so the <br />Cooperators can look at them (there is not a formal review process for the <br />appendices). Gary indicated that Tetra Tech will post all of the <br />appendices to the FTP site. Tom B. will send an email around when those <br />get posted. He reminded the attendees that these are not public <br />information yet and the FTP site is password protected for security <br />reasons. <br /> <br />4) Environmental Mitigation <br />. A draft of the Environmental Mitigation Plan has been reviewed by Gary <br />and comments given back to Tom R. The datum shift has delayed the <br />schedule a bit but now that issue is mostly resolved. The updated data <br /> <br />Tetra Tech <br /> <br />3 <br />