My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00524
CWCB
>
Weather Modification
>
DayForward
>
WMOD00524
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:40:32 PM
Creation date
4/24/2008 2:52:30 PM
Metadata
Fields
Template:
Weather Modification
Contract/Permit #
5-FC-81-05880
Project Name
Sierra Cooperative Pilot Project
Title
SCPP 1986-87 WORK PLAN
Prepared By
State of Nevada, Desert Research Institute
Date
10/1/1986
State
NV
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />1") '\ <br /> <br />'I <br /> <br />. <br /> <br />ei <br /> <br />. <br /> <br />1986-87 WORK PLAN <br />SIERRA COOPERATIVE PILOT PROJECT <br /> <br />Bureau of Reclamation <br /> <br />INTRODUCTION <br /> <br />The Desert Research Institute (DRI) will undertake three primary <br />tasks as part of its involvement in the Bureau of Reclamation's Sierra <br />Cooperative pilot Project (SCPP) in FY-87, These research tasks will <br />be concerned with: (1) the mesoscale meteorology and precipitation <br />of winter storms in the Sierra Nevada; (2) radar observations of the <br />structure of these storms; and (3) measurements of the amount of silver <br />in the snow which has fallen from these storms when seeded with silver <br />iodide, A fourth task is concerned with the overall management of the <br />above listed research, Each of these research tasks involves the <br />collection of data on the winter storms in the Sierra Nevada during <br />the period 3 November 1986 - 9 January 1987 and the analysis and in- <br />terpretation of these data, <br /> <br />It is expected that the analysis and interpretation of the data <br />will be completed by 30 June 1987, A budget is included for each <br />ta sk , <br /> <br />.-/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.