Laserfiche WebLink
<br />5 <br /> <br />III. KU-BAND RADAR ANALYSIS <br /> <br />'" <br /> <br />Colorado State University provided its Ku-band radar to th,c Utah field <br /> <br />effort of 1983 and participated in the reduction and analysis of the data <br /> <br />set. Four work tasks were included in the CSU effort. These included <br /> <br />providing the radar to the Utah field effort, conversion of field tapes to <br /> <br />processed final tapes, providing tabular data and reflectivity displays of <br /> <br />radar parameters. and performing significant data analysis of certain storm <br /> <br />systems. <br /> <br />A. Ku-Band Radar Field Operations <br /> <br />CSU provided its vertically pointing Ku-band radar to field operations <br /> <br />in southern Utah during the period 13 January 1983 - 23 March 1983. Details <br /> <br />of the radar operations. calibrations. field installation and removal. and <br /> <br />problems encountered during the field phase are summarized in Appendix B. <br /> <br />i <br /> <br />B. Data Reduction of Field Tapes <br /> <br />CSU received 14 Ku-band field tapes for reduction and processing from <br /> <br />the Utah field site. These tapes were immediately checked for quality. <br /> <br />The data on these tapes were processed during the month of April 1983. <br /> <br />Two processe.d data tapes containing reflectivity values and other information <br /> <br />for the entire field program were provided to all interested project <br /> <br />participants on 1 May 1983. Complete tables of all Ku-band data received <br /> <br />by CSU, an assessment of data quality. tape documentation. and information <br /> <br />to assist in data interpretation are summarized in Appendix B. <br /> <br />~ <br /> <br />C. Data Display Programs <br /> <br />During the early portions of the 1983 analysis period. CSU developed <br /> <br />programs to display Ku-band reflectivity time/height diagrams and tabular <br /> <br />displays of cloud top height. maximum dBZ. and other parameters. These <br /> <br />were provided to all project participants on 21 July 1983. Details <br /> <br />concerning this data is included in Appendix B. <br /> <br />... <br />