My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00454
CWCB
>
Weather Modification
>
DayForward
>
WMOD00454
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:39:30 PM
Creation date
4/23/2008 11:57:21 AM
Metadata
Fields
Template:
Weather Modification
Title
Preliminary Analysis of the Hypotheses Used in the Utah Operational Weather Modification Program - Final Report
Date
11/1/1983
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5 <br /> <br />III. KU-BAND RADAR ANALYSIS <br /> <br />'" <br /> <br />Colorado State University provided its Ku-band radar to th,c Utah field <br /> <br />effort of 1983 and participated in the reduction and analysis of the data <br /> <br />set. Four work tasks were included in the CSU effort. These included <br /> <br />providing the radar to the Utah field effort, conversion of field tapes to <br /> <br />processed final tapes, providing tabular data and reflectivity displays of <br /> <br />radar parameters. and performing significant data analysis of certain storm <br /> <br />systems. <br /> <br />A. Ku-Band Radar Field Operations <br /> <br />CSU provided its vertically pointing Ku-band radar to field operations <br /> <br />in southern Utah during the period 13 January 1983 - 23 March 1983. Details <br /> <br />of the radar operations. calibrations. field installation and removal. and <br /> <br />problems encountered during the field phase are summarized in Appendix B. <br /> <br />i <br /> <br />B. Data Reduction of Field Tapes <br /> <br />CSU received 14 Ku-band field tapes for reduction and processing from <br /> <br />the Utah field site. These tapes were immediately checked for quality. <br /> <br />The data on these tapes were processed during the month of April 1983. <br /> <br />Two processe.d data tapes containing reflectivity values and other information <br /> <br />for the entire field program were provided to all interested project <br /> <br />participants on 1 May 1983. Complete tables of all Ku-band data received <br /> <br />by CSU, an assessment of data quality. tape documentation. and information <br /> <br />to assist in data interpretation are summarized in Appendix B. <br /> <br />~ <br /> <br />C. Data Display Programs <br /> <br />During the early portions of the 1983 analysis period. CSU developed <br /> <br />programs to display Ku-band reflectivity time/height diagrams and tabular <br /> <br />displays of cloud top height. maximum dBZ. and other parameters. These <br /> <br />were provided to all project participants on 21 July 1983. Details <br /> <br />concerning this data is included in Appendix B. <br /> <br />... <br />
The URL can be used to link to this page
Your browser does not support the video tag.