My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00399
CWCB
>
Weather Modification
>
DayForward
>
WMOD00399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:37:39 PM
Creation date
4/16/2008 11:05:22 AM
Metadata
Fields
Template:
Weather Modification
Title
WMO Training Workshop on Weather Modification for Meteorologists - Lecture Notes
Date
12/1/1979
Weather Modification - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- 9 <br /> <br />3.3.5 Experiment management: A clear tmderstanding of responsibility and authority of the <br />different components and levels within the organization of PEP is necessary for its success. <br />Another prerequisite is the availability of direct and open communication channels. While <br />the relative roles of the PEP Board (ovE!rall responsibility, particularly with regards to <br />resources), the EC Panel on Weather Modification (scientific responsibility), and the <br />Scientific Planning Group (planning of experim.ent and operation) have been established in <br />documents by Congress and EC, it is also clear that the responsibility of the field oper- <br />ation needs to be in the hands of a field site manager. He would be under the supervision <br />of the leader of the Scientific Planning Group (SPG) , and be assisted by a liaison officer <br />from the host country for the PEP site. The field manager should have day to day control <br />of the resources required to maintain the core programme. The SPG has the management <br />responsibility delegated by the Board and co-ordinates all sub-programmes. <br /> <br />The field operation needs a headquarters where all the information is received, <br />collected and validated (with the exception of information gained by sophisticated "visit- <br />ing" aircraft or specialized data processed by research teams which may handle their own <br />data processing). A regular forecast unit should be part of the headquarters of the field <br />operation. There will be other facilities which may be operated by groups from different <br />locations: seeding and cloud physics aircraft, radar, radiosonde units, mobile units, <br />satellite receiving station. It is obvious that direct communications need to be available <br />for day to day decision making and operations, consultation and data transmission. <br /> <br />3.3.6 Data management: There is a key requirement for responsible data quality control, <br />pre-processing and validation by mini-c(~puter and storage. Some data need to be directly <br />available for decision making (synoptic, radar, satellite). Other information (like rain- <br />gauge readings and recordings, radiosonde profiles, cloud physical parameters, etc.) needs <br />to be available as soon as feasible for ongoing research at the site. <br /> <br />The statistical evaluation neE!ds to be updated every year; this is also desirable <br />for the physical assessment. These studies should be prepared as much as possible during <br />the PEP field periods. The evaluation of sub-programme data sets collected by other count- <br />ries needs to be co-ordinated by the SPG with the help of the field manager and the advice <br />of the EC Panel. Evaluations might well be assisted by organized workshops of principal <br />scientists. <br /> <br />3.3.7 Resource and manpower requirements: Considerable equipment and facilities are <br />required for PEP. For seeding and the preliminary evaluation of its effects, the items <br />listed below are needed to accomplish the indicated tasks. <br /> <br />Core: <br /> <br />. <br /> <br />- seeding aircraft (serviceable, equipped for night-time flying, seeding <br />for each aircraft, and supply of seeding material for 5 seasons) <br />- ground generators (if judged adva~tageous, on mountain ridges) <br />- recording raingauges <br />Decision-making: <br />- synoptic meteorology laboratory with facsimile recorders and satellite <br />date receiver <br />- rawinsonde <br />- radiosonde transmitters, balloons, gas and associated equipment <br />(400 sondes per year) <br />- meteorology radar, digitized, possibly 'with mini-computer; 5 or lO cm <br />wavelength <br />Supporting activities: <br />cloud physics aircraft (l available equipped with automated measuring <br />systems + 1 sophisticated aircraft part-time) <br />- raindrop size spectrograph (I-mobile) <br />Data management and pre-evaluation: <br />- analysis centre, data collection and storage <br /> <br />generators <br /> <br />2 <br />5-10 <br />50 <br /> <br />1 <br /> <br />2 <br />2000 <br /> <br />2 <br /> <br />1-2 <br /> <br />2 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.