My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12877
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSPC12877
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:47:05 PM
Creation date
4/15/2008 2:41:06 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.928
Description
Sheephorn Project
State
CO
Date
10/1/1980
Author
W.W. Wheeler and Assoc., inc
Title
Report on Sheep Horn Reservoir Yeild and Cost Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Locat i on <br /> <br />Amount-crs <br /> <br />Dillon Reservoir <br />Green Mountain Reservoir <br />Sheephorn Reservoir <br />Granby Reservoir <br />Williams Fork Reservoir <br />Rued i Reservoir <br /> <br />50 <br />50 <br />300 (1) <br />20-75'>": <br />15 <br />35 <br /> <br />(1) Not established - assumed for these studies <br />*Varies seasonally <br /> <br />4. Transmountain Diversions <br />It was assumed that the following Eastern Slope diversions <br />would be maximized by the owners of the water rights during the <br />study period. The average annual transmountain diversions so <br />determined are as follows: <br /> <br />Diversions <br /> <br />Average Annua I <br />Amount Acre-Feet <br /> <br />Adams Tunnel (CB T) <br /> <br />Moffat Tunnel (includes Fraser River, <br />Williams Fork, Williams Fork <br />Extension and Meadow Creek) <br /> <br />Roberts Tunnel (includes Dillon <br />Res e rvo iron 1 y) <br /> <br />Hoosier Pass Tunnel <br /> <br />Homestake Tunnel (includes Phase <br />and Phase I I development) <br /> <br />Fryi ng Pan Arkansas Proj ect <br /> <br />T\~in Lakes Tunnel <br /> <br />234,000 <br /> <br />147,000 <br /> <br />122,000 <br />12,000 <br /> <br />68 , 000 <br />70,000 <br />57,000 <br /> <br />The following proposed transmountain diversion projects <br />were not included in the studies: <br />Denver's Eagle-PineyjEagle-Colorado Project <br />Denver's East Gore proj ect <br />Denver's Straight Creek Project <br />CBT Six Cities Project <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.