Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />b. Inlet and outlet channels are open. <br /> <br />c. Care is being exercised to prevent the accumulation of <br />trash and debris near the structures and that no fires <br />are being built near the structures. <br /> <br />d. Erosion is not occurring adjacent to the culverts, <br />headwalls, or pipes which might endanger their water <br />tightness or stability. <br /> <br />e. The side ditches are unobstructed and free to drain to <br />the inlet structure. <br /> <br />f. Manually operated slide gates shall be examined, <br />lubricated and trial operated at least once every 90 <br />days. <br /> <br />Immediate steps shall be taken to repair damages, replace <br />missing or broken parts and remedy any adverse conditions <br />disclosed by such inspections. <br /> <br />5.7 BNRR Enforcement <br /> <br />The BNRR Railroad shall maintain the riprap protection at <br />the BNRR bridge over Kiowa Creek. Representatives of the <br />BNRR shall accompany the annual inspection team. <br /> <br />5.8 Proiect Control Marker <br /> <br />Three surface settlement and horizontal movement points <br />consisting of concrete monuments with brass caps or chiseled <br />"X" placed along. the -crestof~the-.levee_syst."IIl-.._ P-eriodic......_- <br />observation of these points will be made by the Flood <br />Superintendent and the Colorado Water Conservation Board's <br />representative. <br /> <br />-21- <br />