My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOODC00179
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOODC00179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:23:36 AM
Creation date
4/14/2008 3:57:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Wiggins
Stream Name
Kiowa Creek
Basin
South Platte
Title
Operations and Maintenance Manual - Kiowa Creek Flood Protection Project
Date
1/1/1989
Prepared For
Wiggins, Department of Local Affairs
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i I <br />I <br />I <br />I <br />I <br />I <br /> <br />PART - I I OPERATION AND MAINTENANCE <br /> <br />4,0 OPERATION PLANS AND CRITERIA <br /> <br />4.1 Levees <br /> <br />During flood periods, the levees shall be patrolled <br />continuously to locate possible sand boils or unusual <br />wetness of the landward slope and to be certain that: <br /> <br />a. There are no indications of slides or Sloughs <br />developing. <br /> <br />b. Wave wash or scouring action is not occurring. <br /> <br />c. No low reaches of levee exist which may be overtopped. <br /> <br />d. No other conditions exist which might endanger the <br />structure. <br /> <br />Appropriate advance measures will be taken to insure the <br />availability of adequate labor and materials to meet all <br />contingencies. Immediate steps will be taken to control any <br />condition which endangers the levee and to repair the <br />damaged section. <br /> <br />4.2 Channel <br /> <br />Appropriate measures shall be taken to prevent the formation <br />of jams of debris or trash. Large objects which become <br />lodged against the bank shall be removed. The improved <br />channel shall be thoroughly inspected immediately following <br />each high water period. The soil-cement channel invert <br />beneath the Burlington Northern Railroad bridge shall be <br />cleaned and inspected each year as noted in the ANNUAL <br />INSPECTION AND MAINTENANCE REPORT. As soon as practicable <br /> <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.