My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOODC00179
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOODC00179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:23:36 AM
Creation date
4/14/2008 3:57:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Wiggins
Stream Name
Kiowa Creek
Basin
South Platte
Title
Operations and Maintenance Manual - Kiowa Creek Flood Protection Project
Date
1/1/1989
Prepared For
Wiggins, Department of Local Affairs
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-8- <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Contact: <br /> <br />Mr. Larry Lang. P.E. <br />Project Coordination Engineer <br />303-866-3441 - Office <br />303-424-4934 - Residence <br /> <br />3.0 PROJECT COORDINATION <br /> <br />3.1 Assurances/Aqreements to FEMA and State of Colorado <br /> <br />The assurances/agreements to the Federal Emergency Management <br />Agency (FEMA) and the State of Colorado are displayed in Appendix <br />B and are included as part of this Operation and Maintenance <br />Manual for the Project. <br /> <br />3.2 Proiect Superintendent <br /> <br />The Town of Wiggins, Colorado shall appoint a permanent <br />committee consisting of or headed by an official, hereinafter <br />referred to as the "Flood Superintendent". The Flood <br />Superintendent shall be responsible for the implementation of the <br />Flood Operations Plan and the annual operation and maintenance of <br />the Project. <br /> <br />3.3 Proiect Certification <br /> <br />The project Certification. as prepared by the Engineer, for the <br />Kiowa Creek Flood Protection Project complies with the structural <br />requirements set forth in 44 CFR Chapter 1. Part 65.11, paragraph <br />(b)(l) through (7) and is certified by: <br /> <br />ARIX-Engineers-Architects-Planners <br />800 Eighth Avenue <br />P.O. Box 2021 <br />Greeley, Colorado 80632-2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.