Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />'I <br />I <br />I <br />I <br />I <br /> <br />2.4 Project Plans and Specifications <br /> <br />The general project plan is shown on Plate No.1. Complete sets <br />of shop drawings and as-built construction drawings are on <br />file in the Office of the Town Manager. Wiggins. Colorado <br /> <br />2.5 List of Project Contracts <br /> <br />Contract Title <br /> <br />Contractor <br /> <br />Date <br />Awarded <br /> <br />Date <br />Completed <br /> <br />Phase I. Kiowa Creek Hurst Construction <br />Flood Protection Sterling. Colorado <br />Project No. 86136.0 <br /> <br />4-10-87 <br /> <br />9-2-87 <br /> <br />Phase II. Kiowa Creek Rocky Mountain <br /> <br />2-23-88 <br /> <br />8-3-88 <br /> <br />Flood Protection <br />Project No. 86136.0 <br /> <br />Constructors <br />Englewood. Colorado <br /> <br />2.6 Project Manaqement <br /> <br />Town of Wiggins <br />Flood Superintendent <br />P.O. Box 287 <br />Wiggins. Colorado 80654 <br /> <br />Town of Wiggins <br />Ass't Flood Superintendent <br />P.O. Box 287 <br />Wiggins. Colorado 80654 <br /> <br />Contact: <br /> <br />Contact: <br /> <br />Mr. John Holdren <br />Town Manager <br />303-483-6161 - Office <br />303-483-6399 - Residence <br /> <br />Mr. Dave Woods <br />Police Chief <br />303-483-7747 - Office <br />303-483-7747 - Residence <br /> <br />Colorado Water Conservation Board <br />Authorized Representative <br />1313 Sherman Street <br />Denver. Colorado 80203 <br /> <br />-7- <br />