Laserfiche WebLink
<br />Collect, plot & analyze <br />TT data, hand drawn <br />maps, FAX products & <br />l2Z DRO rawinsonde <br /> <br />Experimental <br />Day Decision <br /> <br />500 mb Temperature <br />700 mb Wind Fcsts & <br />Cloud Time-Cross Sect <br /> <br />Operational <br />Criteria <br />Evaluations <br /> <br />Basic 24 & 48 Hour <br />Precipitation Fcst <br />& 72 & 96 Hour <br /> <br />1st Day <br />Yes <br /> <br /> <br />- No <br />Yes <br /> <br />MET Sect <br />Alerts <br />1 INC <br />2 CNG Oprs <br /> <br />Maint Sect <br />Routine Mnt <br />Trbl Shtg <br />Reports <br /> <br />MET Sect <br />Studies <br />Data Reduction <br />XD Summaries <br />Reports <br /> <br />e <br /> <br />Suspension Criteria <br />Snow Pack <br />2 Avalanche <br />3 Severe Storm <br /> <br />Establish Desired <br />Gen Network For <br />Optimum Seeding <br /> <br /> <br />Random Event <br />Decision <br /> <br /> <br />Establish Raob <br />Schedule <br /> <br />.Establish Raob <br />Schedule <br /> <br />Notifications <br />1 INC Oprs <br /> <br />Notifications <br />1 Man CNG Oprs <br />2 INC Oprs <br /> <br />e <br /> <br />Activate Required <br />Remote CNG <br />Network <br /> <br />TM System Data Collection & Monitorin <br /> <br />Continuous Synoptic & Meso Scale Eval- <br />uation: Evaluate for possible <br />Emergency shutdown of 0 erations <br /> <br />Review <br />Revise <br /> <br /> <br />erations <br /> <br />Complete Cross Section and Time <br />Section Evaluations <br /> <br />Summarize in Report form Experimental <br />Day Operations <br /> <br />Figure 3 -1. Operational Procedure and Decision Program <br /> <br />e <br /> <br />3-6 <br />