Laserfiche WebLink
<br />CDM <br /> <br />Section 9 <br />Implementation Plan <br /> <br />This section provides a preliminary schedule for implementation of the selected <br />conservation plans and measures and proposed public participation and monitoring <br />processes. <br /> <br />9.1 Implementation Schedule <br /> <br />Table 9-1 provides an implementation schedule for the selected conservation <br />measures and programs. Key actions required to initiate and or continue existing <br />programs are provided. <br /> <br />Table 9.1 Implementation Schedule for Conservation Measures and Programs <br /> <br /> Conservation Measures/Programs I Required Action I Beginning Date <br />Landscape and Irrigation Efficiency for Parks <br />Established Parks <br />. Drought resistant vegetation Continue to establish low water use landscapes and drought Existing measure <br />. Low water use landscapes resistant vegetation where appropriate on existing parks. <br />. Scheduling Continue irrigation schedule. <br />. Moisture Sensors Install moisture sensors at existing parks and monitor 2007 <br /> irrigation. <br />. ET controllers Install demo ET controller at Coal Creek Park and monitor 2007 <br /> irrigation during 2007 irrigation season. If effective install ET <br /> controllers at additional parks. <br />Regulations/ordinances addressing new parks <br />. Design/layout Continue to enforce the Standards and Specifications for Existing measure <br />. Soil preparation Parks and Recreation Construction, promoting low water use <br />. Irrigation equipment landscaping designs, good soil preparation, and efficient <br /> irriQation equipment. <br />Reuse of Reclaimed Water <br />. Use of Non-potable/Reclaimed Water Develop the first phase of the non-potable distribution system Expand program <br /> and promote use of reclaimed water. beginning in 2007 <br />Metering and Billing <br />. Volume billing Continue to bill customers based on the amount of water Existing program <br /> consumed. <br />. Metering of source water Continue current metering of source water as well as Expand program <br /> investigate and implement additional metering of raw source beginning in2007 <br /> water. <br />. Meter Service Connections and Continue metering service connections and replacing old Existing program <br /> Replacement of Meters meters on an annual basis. <br />DistributionlTreatment System Efficiency <br />. Leakage Detection Program Continue leak detection program focusing on specific areas of Existing program <br /> the distribution system on an annual basis. <br />. Leak repai r Continue leak repair proQram. ExistinQ proQram <br />. Improved water accounting Begin to monitor the amount of water used to flush hydrants. 2007 <br />. Analysis of non-account water Modify city ordinance to revise the billing categories and make 2008 <br /> appropriate adjustments to the billing system. <br />. Use of treated reclaimed water for Make the appropriate infrastructure changes necessary to 2008 <br /> flushing/cleaning of SWRF's system accommodate use of non-potable treated reclaimed water as <br /> opposed to potable water. <br /> <br />DRAFT <br /> <br />9-1 <br /> <br />\\DENSVR1\PROJECTS\9228 - ERIE\CONSERVATION PLAN\REPORT\DRAFT PRIOR TO PUBLIC REVIEW\CONNIE FORMATTED\SECTION 9.DOC <br />