<br />Section 4 <br />Proposed Facilities <br /> <br />Table 4-1 Recent and Anticipated Improvements and Additions Within 10-year Planning Period <br /> <br /> I Improvement I New I I I <br />Types Capacity Start Date End Date Projects <br />Acquire additional ,/ n/a n/a Acquisition of additional CBT, <br />surface water Windy Gap, and ditch water <br />supplies riQhts is anticipated. <br />Water treatment ,/ New 4 mgd plant Expanded to 6 mgd Expansion of the Lynn R. <br />facilities began operation in firm in July 2001 and 9 Morgan Water Treatment <br /> March 2000 mgd firm with a peak of Facility <br /> 12 mgd in 2005 <br /> ,/ Anticipate expansion to 16 mgd peak sometime Expansion of the Lynn R. <br /> between 2012 - 2015 Morgan Water Treatment <br /> Facility <br />Wastewater ,/ February 2007 July 2009 Construction of the NWRF <br />treatment facilities ,/ February 2003 August 2007 Expansion/optimization of <br /> SWRF from 0.8 - 1.2 mgd and <br /> from 1.2 - 1.6 mQd <br />Major potable ,/ Will be constructed as needed as development New potable distribution <br />transmission lines continues pipelines <br />Major non-potable ,/ ,/ October 2008 June 2008 Pipeline and pump station from <br />(reclaimed & raw) Boulder Supply Canal to Erie <br />transmission lines Lake and Prince Lake <br /> ,/ ,/ February 2007 June 2008 Pipeline from Erie Lake and <br /> Prince Lake to the Water <br /> Treatment F aci I ity <br />Non-potable water ,/ February 2007 July 2009 1,000 AF of non-potable <br />storage storage at the NWRF <br />Non-potable water ,/ 2007 - 2008 Will depend on rate of Non-potable water distribution <br />distribution system development system <br /> <br />CDM <br /> <br />DRAFT <br /> <br />4-2 <br /> <br />\\DENSVR1\PROJECTS\9228 - ERIE\CONSERVATION PLAN\REPORT\DRAFT PRIOR TO PUBLIC REVIEW\CONNIE FORMATTED\SECTION 4.DOC <br />