My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Erie_WCPlan_Application
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Erie_WCPlan_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:34:04 AM
Creation date
4/9/2008 11:55:59 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Applicant
Town of Erie
Project Name
Town of Erie Water Conservation Plan
Title
Town of Erie Application for Water Conservation Plan
County
Weld
Water Efficiency - Doc Type
Application
Document Relationships
Erie WC Plan2008
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CDIVI <br /> <br />Town of Erie Water Conservation Plan Grant Amendment <br />March 2007 <br /> <br />2. Provide a water savings target of 15% on all existing city irrigated parks and <br />landscaping by 2014 and optimize irrigation efficiency on all new city irrigated <br />parks and landscaping1. <br /> <br />3. Achieve an additional 300 AFYl of reclaimed (reused treated effluent) water use <br />by 2014 (this does not include current non-potable irrigation on Vista Ridge) to the <br />extent that development occurs as anticipated and the reclaimed water system is <br />constructed. <br /> <br />4. Select conservation measures and programs that are compatible with the <br />community. <br /> <br />5. Establish a monitoring system that collects a sufficient amount of data to <br />effectively measure the success of conservation programs and measures on an <br />annual basis. <br /> <br />These preliminary goals may be updated to reflect additional data and decisions <br />made through the Conservation Plan development process. <br /> <br />4.0 Project Schedule <br /> <br />The preliminary project schedule identifying key activities and milestones is <br />presented in Table 1. <br /> <br />T bl 1 P r . <br /> <br />P . tS h d I <br /> <br />a e re Imlnary rOJec c e u e <br />Task Deliverable Dates <br />Grant application sent to CWCB for approval. January 31,2007 <br />CWCB reviews grant application and provides feedback February 13, 2007 <br />Erie meets with CDM to discuss components of the Plan February 13, 2007 <br />Grant amendment submitted to CWCB March 1, 2007 <br />50 Percent Completed Report Submitted to CWCB March 30, 2007 <br />CDM submits draft of Plan to Erie for review. This draft is to include April 16, 2007 <br />all plan elements with exception of the public outreach component. <br />Erie provides comments to CDM April 23, 2007 <br />CDM incorporates comments and submits Draft Conservation Plan April 30, 2007 <br />to CWCB as a part of the 95 Percent Completed Report <br />95 Percent Completed Report Submitted to CWCB April 30, 2007 <br />Draft is given to Erie for the 30-day public review period May 7, 2007 <br />Public Review Period (30 days) May 8, 2007 - June 8, 2007 <br />Public Meeting/Open House to introduce the Conservation Plan and May 23, 2007 <br />conservation goals. <br />CDM receives consolidated public comments from Erie to June 15, 2007 <br />incorporate into draft. <br />CDM submits Final draft to CWCB for approval (including the public June 22, 2007 <br />participation element). <br />CWCB approves final Conservation Plan After June 22,2007 <br /> <br />1 This savings is included in the total water savings presented in Goal #1. <br /> <br />4 <br /> <br />\\DENSVR01\PROJECTS\9228 - ERIE\CONSERVATION PLAN\GRANT APPLlCATION\WATER CONSERVATION AMENDMENT FINALDOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.