Laserfiche WebLink
<br />3 <br /> <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Acknowledgements <br /> <br />Gauthiere Engineering, Inc. would like to thank the Seven Lakes Reservoir <br />Company for the valuable assistance during the preparation of this report. <br />Special thanks are offered to Mr. Vern Kammerzell, President of Seven Lakes <br />Reservoir Company, Mr. Ron Brinkman, Manager of Seven Lakes Reservoir <br />Company, Mr. Martin Howell, P.E., City of Greeley, Mr. Kirk Russell, P.E., <br />Colorado Water Conservation Board (CWCB), and Mr. Bruce Johnson, P.E., <br />Colorado Water Conservation Board (CWCB). Mr. Gene Eliassen, Field <br />Engineer for BNSF Railroad, Mr. Ed Gallagher, Division Engineer for BNSF <br />Railroad and Mr. Scott Peterson, Roadmaster for BNSF Railroad are recognized <br />for their significant contribution to this study. Our appreciation is also extended to <br />Mr. Kevin W. Gingery, P.E. (City of Loveland) for sharing valuable information <br />contained in a hydrologic and hydraulic modeling report titled Dry Creek Existing <br />Condition Analysis, prepared for the City of Loveland by Ayres Associates dated <br />July 2006. <br />