Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CLIENT: Seven Lakes Reservoir Company <br /> <br /> TABLE V-4 <br /> CONSTRUCTION COST ESTIMATE - DRY CREEK AL TERNA TIVE 4 <br /> (NEW RAILROAD BRIDGE ALTERNATIVE) <br />ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL <br />1 Mobilization and Demobilization LS 1 60 000 00 $ 60 000 <br />2 Excavation CY 400 7.50 3000 <br />3 Base Rock CY 50 14.00 700 <br />4 Oewaterinn LS 1 25,00000 25,000 <br />5 Grouted RlOrao Channel Protection CY 800 10000 80 000 <br />7 Furnish & Install 28' Main Rail $nan Bridne LF 28 4,20000 117 600 <br />8 Furnish & 1051a1l2-16' Annroach Snan Bridnes LF 32 4,20000 134 400 <br />9 Demolition & OisDOsal CY 938 160.00 150.080 <br />10 Landscaninn & Reseedinn LS 1 2 50000 2,500 <br />11 Fencina& Satetv Railina LS 1 5000.00 5.000 <br />12 Land. ROW & Permitina LS 1 2 00000 2,000 <br />13 Insurance LS 1 7.000.00 7.000 <br /> SUBTOTAL 587.280 <br /> Contingencies 20% 117.456 <br /> SUBTOTAL 704,736 <br /> ENGINEERING & CONTINGENCIES 10% 70,474 <br /> TOTAL ESTIMATED COST S 775.210 <br /> <br />GAUTHIERE ENGINEERING. INC. <br /> <br />28 <br /> <br />12/1f2006 1042 AM <br />