Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CLIENT: Seven lakes Reservoir Company <br /> <br /> TABLE V.3 <br /> CONSTRUCTION COST ESTIMATE. DRY CREEK ALTERNATIVE 3 <br /> (TEMPORARY RELOCATION OF MAIN TRACK AND OPEN CUT CULVERT ALTERNATIVE) <br /> . '" . . - <br />ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL <br />1 Mobilization and Demobilization LS 1 87 00000 $ 87 000 <br />2 Excavation CY 740 7.50 5550 <br />3 Base Rock CY 50 14.00 700 <br />4 Dewalerina LS 1 25.00000 25,000 <br />5 Concrete Footer Slab CY 60 643.00 38 580 <br />6 Concrete Headwalls and Winnwalls CY 325 64300 208975 <br />7 Demolition & Oisnosal CY 300 150.00 45,000 <br />8 Groul Fill CY 20 500 00 10,000 <br />9 Com acted Backfill at Structure CY 750 12.00 9,000 <br />10 lema. Relocation of 1,300 LF of Main line Track LS 1 144,00000 144,000 <br />11 Grade Work LS 1 60000.00 60,000 <br />12 Install (onen cut' 144" CMP LS 1 216,000.00 216000 <br />13 Landscaoina & Reseedina LS 1 2 500.00 2,500 <br />14 Fencina & Safetv Railinn LS 1 5 000 00 5000 <br />15 land, ROW & Permitino LS 1 5000.00 5,000 <br />16 Insurance LS 1 10,00000 10.000 <br /> SUBTOTAL 872,305 <br /> Contingencies 20% 174.461 <br /> SUBTOTAL 1 046 766 <br /> Engineering 10% 104.677 <br /> TOTAL ESTIMATED COST $1,151.443 <br /> <br />GAUTHIERE ENGINEERING, INC. <br /> <br />27 <br /> <br />121112006 1042 AM <br />