Laserfiche WebLink
exceed 90% of Project expenses. The terms of the loan shall be a 20-year loan at 2.00% <br />per annum. Security for the load shall be in compliance with CWCB Financial Policy #5. <br />Staff further recommends that final approval of the loan be conditioned upon all other <br />standazd contracting provisions of the CWCB. The motion was approved unanimously <br />(10-0). <br />11 e. Water Supply Planning and Finance Section -Construction Fund and Severance Tax Trust Fund <br />Perpetual Base Account -New Loans -Bijou Irrigation District -Empire Reservoir East <br />Embankment Dam Repair <br />Tape 4, Track 1 00:00:00 - 00:06:32 <br />Action: A motion was made by Eric Wilkinson and seconded by Don Schwindt to approve Staff <br />recommendation that the Board approve a loan not to exceed $2,408,850 ($2,385,000 for <br />project costs and $23,850 for the 1% Loan Service Fee) from the Severance Tax Trust <br />Fund Perpetual Base Account to the Bijou Irrigation District for the emergency repair of <br />the East Dam. The recommended terms of the loan are 30 years at 2.25% per annum;. <br />Security for the loan shall be in compliance with CWCB Financial Policy #5. Staff <br />further recommends that final approval of the loan be conditioned upon all other staz~dazd <br />contracting provisions of the CWCB and upon the District's election and voter approval <br />of debt. Barbara Biggs and Hazris Sherman were not present for the motion. The motion <br />was approved unanimously (8-0). <br />~, 12. Water Supply Planning and Finance Section -Changes to Existing Loans -Beaver Reservoir <br />Company -Beaver Reservoir Rehabilitation Project <br />.Action: A motion was made by Keith Catlin and seconded by Don Schwindt to approve Staff <br />recommendation that the Board approved a loan not to exceed $510,035 ($504,985 for <br />project costs and $5,050 for the 1% Loan Service Fee) to the Beaver Reservoir Company <br />for engineering and construction costs associated with the Beaver Reservoir <br />Rehabilitation Project, from the Severance Tax Trust Fund Perpetual Base Account. The <br />terms shall be based on their previous agricultural rate of 2.5% per annum for 30-yeazs. <br />', 1?inal approval of the loan shall be conditioned upon all standard contracting provisions <br />of the CWCB Loan Program. Security for the loan shall be collateral in compliance with <br />CWCB Loan Policy #5. Hams Sherman was not present for this motion. 'The motion <br />was approved ((9-0). <br />ADJOURNED 7:30 p.m. <br />Wednesday, January 23, 2008 <br />Call to Order 8:00 a.m. <br />13. Water Information Section ~ Presentation on the South Platte DSS <br />Action: This Agenda Item has been moved until the March 2008 Board meeting. No action <br />taken. <br />14. Stream and Lake Protection Section -New Appropriafion Recommendations in Water Divisions <br />1, 2, S,and6 <br />Tape 4, Track 1 00:06: S 1- 01:13:27 <br />Action: A motion was made by Barbara Biggs and seconded by Don Schwindt to approve Staff <br />recommendation that the Boazd declare its intent to appropriate instream flow water <br />rights on the stream segments identif ed in the Board memo, in accordance with lnstream <br />Flow Rule S.d. Staff has reviewed each proposed stream segment to ensure that for each <br />flow recommendation, the data set is complete and standazd methods, and procedures <br />were followed. In addition, Staff has completed its water availability studiGes. Staff has <br />identified 19 stream segments in Water Divisions 1, 2, 5, and 6 for which sufficient <br />information has been compiled and anaysises performed upon which the Board can Ibase <br />