Laserfiche WebLink
~-/~ <br />• CITI~' OF LAS ANIMAS <br />WATER SYSTEM IMPROVEMENTS <br />WATER SUPPLY RESERVE ACCOUNT <br />GRANT APPLICATION <br />All funding sources presented within the application have been committed <br />a. $800,000 - DOLA C.DBG (grant) -committed on August 20, 2007 <br />b. $10,000 - CDPHE Advance Planning Grant -committed on March 1, 2007 <br />c. $400,000 -local commitment - committed in March 2007 <br />i. $250,000 from the retained Earnings in the water reserve account <br />ii. $150,000 from the Infrastructure and Improvement Fund <br />d. $812,000 - CWR&PDA DRWF loan -committed on September 18, 2007 <br />2. Overall, the City of Las Animas will be paying for 49% of the project if CWCB contributes <br />the total amount requested. If CWCE3 does not contribute, the City will be paying for 60% of <br />the total project cost. <br />3. As presented within CWCB's discussion section, one of the questions presented is directed <br />to how the correctional facility is coni:ributing fiscally to the project. As a direct result of the <br />project, the correctional facility's user rates have been increased from $3.75 per 1,000 <br />gallons above 800,001 and above of monthly consumption to $4.00 per 1,000 gallons. This <br />will effectively generate an additional $255 per month or $3,060 annually based on the <br />correctional facility's current usage. Furthermore, as a result of the expansion of the <br />• correctional facility, all additional water will be billed at this new rate. The anticipated <br />increase in demand is approximately 2.2 million gallons per month, which equates to an <br />additional $8,800 per month or an additional $105,600 annually. However, there is a cost <br />to generate this additional water, ~~vhich is estimated to be $1.41 per 1,000 gallons. <br />Therefore, the projection is that the City will net an additional $68,000 annually from the <br />correctional facility. The new DWRF loan plus the 110% coverage ratio will require an <br />annual allocation of approximately ;30,000, which provides the city with approximately <br />$38,000 annually of additional funds„ Therefore, the correctional facility is paying for their <br />share of the project byr covering the full cost of the new debt and providing additional <br />retained earnings for future repairs identified within the city's Water System Evaluation <br />Preliminary Engineering Report. <br />4. Note that the City's Preliminary Enginneering Report for Water System Evaluation identified <br />$5,018,283 of repairs needed within the water system. The City is currently undertaking a <br />slightly under half of those identified repairs as a result of realistic fiscal limitations. <br />5. The project is currently under design and is projected to be under construction beginning in <br />the summer months of 2008. Given the time frame the city is facing for the added water <br />system demands, any postponement of the request will have significant implications on <br />construction activities and related costs as well as the city's ability to meet the increased <br />demands. Given these time frames, .action on the request is needed during the March 19tH, <br />2008 session. <br />6. The City of Las Animas monitors its grater usage closely from month to month in an effort to <br />reduce their water losses. This provides the City the needed knowledge as to when a leak <br />becomes present that requires attention or if abnormal water usage is occurring from a <br />customer. <br />C:1D000ments antl Settings\ro3lLOCaI Settings\Temporary Internet Files\OLK92Vltltl Info CWCB.doc 1 <br />