My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12986
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:34:29 PM
Creation date
3/31/2008 12:49:19 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.750
Description
California 4.4 or QSA or Water Plan
State
CA
Basin
Colorado Mainstem
Date
10/15/1999
Author
State of California, CVWD, IID, SDCWA, MWDSC
Title
California 4.4 Plan / QSA / Water Plan - Key Terms for Quantification Settlement Among the State of California, IID, CVWD and MWD
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br />) <br /> <br />E <br /> <br />for Construction (ID#WPU2200); and (2) beginning on January 1, 2025, the <br /> <br />Gross Domestic Product Implicit Price Deflator, <br /> <br />G. "Materiality" and grammatical variations thereof reference a standard that will be <br /> <br />negotiated on a provision-by-provision basis. <br /> <br />H. "Quantification Period" is defmed in V. <br /> <br />1. "Revised Surplus Criteria" is defined in IV.B. <br /> <br />J. "Second 50 KAF Environmental Minimum" means $5 million in 2001 dollars or <br /> <br />such greater amount, if any, as MWD may determine during the period for <br /> <br />developing the complete legal documents. <br /> <br />K. "Year _" ( e.g" Year 25) means one of the series of calendar years occurring <br /> <br />within the Quantification Period, with Year 1 being the first calendar year of the <br /> <br />Quantification Period. <br /> <br />III. WATER BUDGET DURING THE QUANTIFICATION PERIOD <br /> <br />A, IID Ouantification Arrangements. <br /> <br />1. IID Cap of Priori tv 3. Subject to the inadvertent overrun provisions, lID's <br /> <br />Consumptive Use entitlement under its share of Priority 3 will be capped <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.