My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12741
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSPC12741
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 1:49:23 PM
Creation date
3/28/2008 9:19:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8064.200.A
Description
Indian Water Rights - Gallup-Navajo
Date
9/3/2004
Author
USDOI/BOR
Title
Biological Assessment, Navajo Gallup Water Supply Project - Report and Appendices
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br />I <br /> <br />Table 3.5 <br /> <br />Summary Flow Statistics for Full NGWSP Development plus Baseline <br />Depletion'. <br /> <br />I <br /> <br /> Discharge (cfs) <br />Duration >10,000 >8,000 >5,000 >2.500 <br /> Average Frequency <br />1 days 32.3% 52.3% 67.7% 90.8% <br /> -- <br />5 days 24.6% 43.1% 63.1% 81.5% <br />10 days 16.9% 35.4% 61.5% 75.4% <br />15 days 7.7% L~2%_ 55.4% 69.2% <br />20 days 24.6% 69.2% <br />21 days L 47.7% <br /> -- <br />3D days 13.8% 41.5% 63.1% <br />40 days 32.3% 50.8% <br />50 days 26.2% 46.2% <br />60 days 15.4% 41.5% <br />80 days 10.8% 30.8% <br /> Maximum Years Without Meeting Criteria <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Flow Criteria - Min. Duration Allowed Modeled <br />9700 cfs for 5-days - 10-years 10 L 14 <br />7760 cfs for 10-days - 6-years 6 7 <br /> - <br />4850 cfs for 21-days - 4-years 4 4 <br />2450 cfs for 10-days - 2 years 2 2 <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />14 Shaded cells reprcsenl conditions mal do not meet flow recommendations. <br />BIOLOGICAL ASSESSMENT <br />NAVAJO GALLUP WATER SUPPLY PROJECT <br />September 3, 2004 <br /> <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.