Laserfiche WebLink
<br />IRRIGA TION REQUIREMENTS <br /> <br />The amount of water made available to the Project for irrigation was determined jointly by <br />Northern Colorado Water Conservancy District and Reclamation in the latter part of March. <br />Estimations for the irrigation requirements for the three inflow conditions, maximum probable, <br />most probable, and minimum probable, were derived by analyzing actual use in similar runoff years <br />when the supply of Project water was ample. <br /> <br />Estimated supplemental irrigation deliveries from Green Mountain Reservoir to irrigators in the <br />Colorado River Basin are included in the release from Green Mountain Reservoir, according to the <br />"Operating Criteria for Green Mountain Reservoir." <br /> <br />17 <br />