<br />wet. Snowpack began to drop during March, just to bounce back in April. In response, the Project <br />reservoirs storage volumes were kept above average throughout the water year. <br /> <br />In May, greater than average snow and rain occurred, resulting in higher than anticipated inflows to <br />Project reservoirs, especially during the month of June. Project operations reduced the flows along <br />the upper Colorado River basin without increasing stream flows in the South Platte River. <br /> <br />Estimated flood damages prevented in the Colorado River Basin during 1997 by the operation of <br />Lake Granby and Green Mountain Reservoir were $0 and $12,000, respectively. Since <br />construction, the Project has prevented flood damages totaling $302,000. <br /> <br />]6 <br />