My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12890
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:19:19 PM
Creation date
3/24/2008 2:25:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8537.600
Description
Rio Grande National Forest Issues
Basin
Rio Grande
Date
4/30/1999
Author
USDA / Rio Grande National Forest
Title
Forest Plan Revision Roundup Newsletter #14
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LA GARITA TRAIL Reconstruct the LaGarita Trail. Major portions of this trail will be Land survey <br />#793 relocated away from the stream and around the private property. completed in <br /> Work may not begin until late 1997 or 1998 depending on a land sur- 1998. Project <br />4-02 vey which will determine the private/public property boundaries. A work begins in <br /> mini excavator may be used together with working crews. Minor 1999. <br /> blasting may occur on rocky sections. Motorized (motorcycle and <br /> ATV) ARTMARCILLA (719)657-3321 Divide Ranger District <br />INDIAN CREEK Construction of approximately 1 mile of trail to connect Indian Creek Project tabled <br />CONNECTOR TRAIL to Antora Meadows. Project is located approximately 18 miles NW indefinitely. <br />#766 of Saguache. Non-motorized JIM JAMINET (719) 655-2547 <br />7-14 Sal!uache Ranl!er District <br />WASON TRAIL This trail is also known as the Inspiration Point Trail and the Mam- Decision made <br />#789 moth Mountain Trail which leads to Wason Park and LaGarita Wil- May 21, 1998. <br /> derness. The proposals are to reroute a small portion of this trail Private land <br />4-47 around private property at the lower end, continue the existing his- ROW <br /> toric route, or construct a new trail which is not adjacent to private pending. <br /> property. These alternatives have resulted in public meetings in <br /> Creede. ARTMARCILLA (719)657-3321 DivideRangerDistrict. <br />NORTH ROCK TRAIL Reconstruction work will probably not begin until 1997 or 1998 de- Analysis in <br />#701 & DRY CREEK pending on the appropriated funds. A mini excavator may be used progress. <br />TRAIL #700 and minor blasting may occur. This trail will be managed for non- <br />4-05 motorized uses. ART MARCILLA (719) 657-3321 Divide District <br />KELLY CREEK This project involves relocation of the existing trailhead to move it Construction <br />TRAILHEAD out of the riparian area. Other resources affected may be the access scheduled for <br />7-34 road to trailhead and allotment pasture fences. The project is located summer 1999. <br /> about 1 mile north of Villa Grove, CO. and 5 miles west at the end of <br /> PDR 873. The trailhead serves PDT 923. JIM JAMINET, <br /> (719) 655-2547 Saguache Ranger District. <br />EYE OF THE NEEDLE This project involves relocation and improvement of the access trail Analysis in <br />PASS to the popular Crestone Needle and Crestone Peak area in the Sangre progress. <br />7-35 de Cristo Wilderness. Project location is approximately 6 miles east <br /> of the Town of Crestone. Project support may require helicopter re- <br /> supply of work camp. SID HALL, (719) 655-2547, Saguache <br /> Ranl!er District <br />WHEELER The Divide District will be completing a signing and trail project as- CE expected to <br />GEOLOGIC AREA sociated to the Wheeler Geologic Area. The trail portion of the project be completed in <br />SIGNING AND consists of rehabilitation of several multi-trailing and switchback cut- May, 1999. <br />TRAIL PROJECT ting sections, rerouting a short section oft of a bog/wet area, and ad- <br /> dressing a section that continues to sluff. The signing consists of an <br /> informational sign at the start of the 4WD Road notifying travelers of <br /> the road conditions from Hansens Mill to the end of Forest Road 600. <br /> At the end of the 4WD road several interpretive signs will be placed, <br /> all outside of the wilderness, explaining the geology of the area, the <br /> formations, and wilderness Leave No Trace messages. Some junction <br /> signing may occur as well on trails within the wilderness. The project <br /> will be completed in conjunction with Volunteers for Outdoors Colo- <br /> rado. JODY FAIRCHILD, (719)658-2556, DIVIDE RANGER <br /> DISTRICT <br />SODA SPRINGS This is a BLM project that involves construction of a parking area to Scoping in <br />TRAILHEAD AND accommodate 6-8 vehicles and construction of approximately 1/2 mile progress. <br />TRAIL of new trail to access Soda Springs and Schoolhouse Gulch areas. This Comment pe- <br />CONSTRUCTION project is proposed to provide access around private property. Project riod extended to <br /> location is off CR LL56 in T46N, R8E, Sec 27. SID HALL, June 1, 1999 <br /> SAGUACHE FIELD OFFICE, (719) 655-2547 <br /> <br />TRAILS <br />
The URL can be used to link to this page
Your browser does not support the video tag.