My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12890
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:19:19 PM
Creation date
3/24/2008 2:25:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8537.600
Description
Rio Grande National Forest Issues
Basin
Rio Grande
Date
4/30/1999
Author
USDA / Rio Grande National Forest
Title
Forest Plan Revision Roundup Newsletter #14
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SAGUACHE An environmental analysis to allow personal and commercial removal of common Analysis <br />DISTRICT surface rock, primarily for landscaping purposes, for a two-year period. Principal in <br />COMMON areas of collection will be from designated surface rock outcrops, formations, or progress. <br />VARIETY collection areas adjacent to roads. Permits would allow for removal of up to an <br />MINERALS estimated 100 - 250 tons and values of less than $1000.00, per sale. District-wide <br /> on the Saguache District. KATIE STUART, (719) 655-2547, Saguache Ranger <br /> District. <br /> <br />NORTH FORK Riparian restoration, road re-Iocation, and alternate water source Project scheduled <br />SAGUACHE CREEK for wildlife and livestock and channel stabilization. Located in for completion <br />RIPARIAN Saguache Park. SUE SWIFT-MILLER (719)852-5941, summer of '99. <br />7-19 Sunervisor's Office. <br />EAST PASS CREEK Construction of a series of slash check dams to intercept Soil erosion monitoring <br />EROSION CONTROL and filter sediment-laden runoff waters before they enter has already begun. Bro- <br />AND FISHERIES East Pass Creek. This is a Partner project with contribu- sion control/check pins <br />IMPROVEMENT tions from the State Highway Department, and Trout Un- have been established. <br />PROJECT limited. Contact SUE SWIFT-MILLER, (719)852-5941, Remainder of project <br /> or write to the Supervisor's Office address about this delayed. <br />7-30 Sai!uache District nroiect. <br />DIFFICULT WATER- Proposal to install waterbars at proper spacing, clean plugged cuh Comments being <br />SHED RESTORATION verts; replace washed out or damaged culverts. Develop two ex- accepted. <br /> isting springs to draw livestock away from Difficult Creek, and rip <br /> selected skid trails and revegetate with native grasses; correct <br /> drainage of skid trails. Contact JOHN RA WINSKI, (719)852- <br /> 5941, at the Sunervisor's Office for this Divide District nroiect. <br /> <br />WATERSHED <br /> <br />BIG SPRINGS CREEK Project to restore native fish community to Big Springs Creek. Scoping comments <br />NATIVE FISH SUE SWIFT-MILLER, (719)852-5941, Supervisor's Office. being accepted until <br />RESTORATION June 15, 1999. De- <br /> cision expected Jul <br /> '99. <br />NORTH FORK This project would entail constructing a fish barrier to protect the Scoping comments <br />CARNERO CREEK existing native trout fishery in North Fork Camero Creek. being accepted until <br />NATIVE FISH Project location T42N, R5E, Sec 11, NE 1/4. Contact SUE- June 15, 1999. <br />RESTORATION SWIFT MILLER, (719)852-5941, at the Supervisor's Office for <br /> this Sa.lmache District Proiect <br />CONEJOS RIVER This project would include creating boulder and root wad structures Comment pe- <br />FISHERIES and reshaping the channel to promote pool development. The goal of riod extended to <br />HABITAT this habitat improvement project is to provide overwintering habitat, June 15, 1999. <br />IMPROVEMENT which may lead to the development of a naturally reproducing trout <br /> population in this area. This is a joint project being proposed by the <br /> Colorado Division of Wildlife, Trout Unlimited and the Rio Grande <br /> National Forest. Project work would occur in approximately 1.5 miles <br /> of stream in T.36N, R4E, NE 1/4 Sec 25. <br /> Contact SUE SWIFT -MILLER at the SUPERVISOR'S OFFICE <br /> (719) 852-5941 <br /> <br />WILDLIFE AND FISHERIES <br /> <br /> Proposal is a joint project between the Colorado Dept. of Hiways, Expect a <br /> Natural Resources Conservation Service, Colorado State Forest Service decision in late <br />HIGHWAY 149 LIVING and the Rio Grande National Forest to plant trees/shrubs along High- Mayor early <br />SNOW FENCE way 149 and establish, over time, a living snow fence. Location is June '99. <br />T42N, R3W, Sec 2 The area where snow is a problem is ap- <br /> proximately 300 feet in length. Contact RONNIE DAY, (719)657- <br /> 3321 DIVIDERANGERDISTRICT <br /> <br />FOREST SERVICE PROJECTS <br /> <br />_..0<1.....--.......,..-"....... - ,...... <br />
The URL can be used to link to this page
Your browser does not support the video tag.