My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12705
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSPC12705
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:19:16 PM
Creation date
3/21/2008 5:06:09 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8230.400.30.F
Description
Durango RICD - Other Reports
State
CO
Basin
Colorado Mainstem
Water Division
7
Date
9/7/2007
Author
McLaughlin Rincon, Ltd.
Title
Review of Submitted Information Related to the Durango RICD - with staff comments
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Richard E. McLaughlin, P.E. <br /> <br />structure. Administrative tasks included working with the U.s. Army Corps of Engineers and <br />the Colorado Highway Department. <br /> <br />Investigation of Various Drainage Problems, Front Range, CO <br />Principal-in-Charge: A) Investigation of reported drainage problems related to highway <br />improvements for the Colorado Department of Transportation (cDOT) at the Del Camino <br />Interchange on 1-25. Tasks included hydrologic investigation and review, cost estimating, and <br />legal deposition. B) Investigation of surface drainage problems for the Village Townhouses <br />located at Wadsworth Blvd. and Yale Avenue. Tasks included hydrologic investigation and <br />review, preliminary design of improvements, and cost estimating. C) Evaluation of surface <br />water problems at the Walgreen's at Parker and Quebec. Evaluated failure of embankment, <br />hydrologic study, storm drainage system design, detention pond design and proposed remedial <br />improvements. <br /> <br />Review of Drainage Plans, CO <br />Principal-in-Charge: In a review capacity for towns and governmental agencies, conducted the <br />review of numerous drainage plans for the City of Brighton, the Town of Salida, and the <br />Highland Park Association. Reviews included: hydrologic studies, proposed storm sewer <br />systems, detention and retention ponds. Tasks also included advice on policy issues and <br />development of drainage criteria. <br /> <br />Water and Wastewater System Engineering, Colorado <br />Water Lines, Pump Stations, Control Systems, Wastewater Infrastructure, and Rules and <br />Regulations - Snowmass Water and Sanitation District, Green Mountain Water and Sanitation <br />District, North Pecos Water and Sanitation District, Aspen Water District, & Town of Silver <br />Plume, CO <br /> <br />District Engineer, Design Engineer, Project Management and Inspection: Design and contract <br />administration for various utility projects in developed and undeveloped environments. Projects <br />were part of district-wide improvements system improvements and expansions. Components of <br />the work included water supply, pipelines, tanks, pump stations, PRV vaults, highway and street <br />crossings, creek and river crossings, diversions, maintenance of customer service, and <br />coordination with government agencies. <br /> <br />Publications and Presentations <br />(Within last 10 years) <br /> <br />McLaughlin, Richard E. and John M. Pflaum. "Dam Safety for River Users." Public Works <br />Magazine, pp. 54. June 1999. <br /> <br />McLaughlin Rincon, Ltd. <br />
The URL can be used to link to this page
Your browser does not support the video tag.