Laserfiche WebLink
<br />Richard E. McLaughlin, P .E. <br /> <br />hydraulics, tributary area basin hydrology, report writing, cost estimating, and alternative <br />analysis. <br /> <br />Flat Rock Drainage Master Plan, City of Tulsa, OK <br />Project Engineer: Master planning for an area that included three major drainage basins totaling <br />almost 38 square miles. Extensive hydraulic and hydrologic modeling for floodplain delineation <br />and alternative analysis. Preliminary designs were prepared for detention facilities, and <br />alternatives evaluation included hydraulic structure combinations, acquisition, flood proofing, <br />and modifications to existing structures. Capitalized cost, safety, and extensive damage analyses <br />were included in the total alternative analysis. High hazard zones were identified, and a <br />comprehensive prioritized basin-wide plan was compiled. <br /> <br />Bridle Trails Master Plan Update, City of Tulsa, OK <br />Project Engineer: Update of drainage basin master plan, included hydrology and hydraulic <br />analysis, alternative evaluation, and cost estimating. A custom reservoir routing program was <br />written to model a side spill detention pond that included tailwater effect on the side spill weir <br />and backwater effects on the flow split structure. An extensive damage analysis included <br />generating damage curves for 30 events, with individual calculations for more than 50 homes or <br />points of interest. <br /> <br />Golf Course Engineering, Colorado: <br />Thorncreek Golf Course, City of Thornton, CO <br />Battlement Mesa Golf Course Improvements, Exxon USA, Parachute, CO <br /> <br />Project Engineer and Project Manager Roles: Design of drainage components golf courses in <br />floodplains. Work included hydrology, design of heavy infrastructure and drainage <br />improvements. Design of water features and drainage channels, including flow determination, <br />erosion protection, a recirculation system, culvert entrances and outlets, ponds, and waterfalls. <br /> <br />East Cherry Creek Detention Facility, East Cherry Creek Valley Water and Sanitation <br />District, Denver, CO <br />Project Engineer: Preliminary design, including facilities layout, extensive hydraulic analysis, <br />probable maximum flood hydrology, embankment erosion analysis, hydraulic structure design, <br />and energy dissipater design. Involved with state engineering criteria and the State Engineer's <br />Office. <br /> <br />Morrison Diversion Dam, Pipeline and Grit Chamber, Town of Morrison, Morrison, CO <br />Project Engineer: Design of a 24-inch suspended and insulated steel pipeline along Bear Creek <br />Canyon. Design involved attaching pipeline supports to rock face, 90-foot span bridges, a <br />110-foot-Iong tunnel, and specialized insulating and jacketing detail. Design of a 15-cfs raw <br />water grit chamber in a remote area and preliminary design for a diversion dam and intake <br /> <br />McLaughlin Rincon, Ltd. <br />