Laserfiche WebLink
<br /> <br />~ . <br /> <br />Table 3.7 Seeding Program Cost Estimate for Salt River <br />drainage only (1000's Dollars) <br /> <br />Item <br /> <br />Ground-based <br />Seeding Program <br /> <br />Ground-based <br />and aerial <br />Seeding Program <br /> <br />Labor1 <br /> <br />$68 <br /> <br />$68 <br /> <br />Operations20ffice <br />and Data <br /> <br />11 <br /> <br />11 <br /> <br />Rawinsonde <br /> <br />10 <br /> <br />10 <br /> <br />Ground-based seeders 4 <br /> <br />4 <br /> <br />Seeding Aircraft 0 <br />Seeding Reimbursables3 15 <br /> <br />40 <br /> <br />45 <br /> <br />Living Allowance 8 <br />Trave14 4 <br /> <br />8 <br /> <br />4 <br /> <br />Reports 1 <br /> <br />1 <br /> <br />Sub-Total $121 <br /> <br />$191 <br />$257 <br /> <br />Total with loading $163 <br /> <br />1) Labor costs include one man-month for evaluation and reporting. <br /> <br />2) These costs could be avoided if items were supplied by <br />Salt River Project. <br /> <br />3) Reirr.bursables include seeding agent, operator payments, <br />aircraft flight time, and pilot costs. <br /> <br />-4) Ground-based network installation, maintenance, and removal. <br /> <br />3-32 <br />