Laserfiche WebLink
<br />'!able 3.6 Seeding Program Olst Estimate (l)OOO's l):)llars) <br /> <br /> Ground-based <br /> Seeding Program Ground.-based <br /> Ground-based with and aerial <br />Item Seeding Program ~buntaintop Seeders Seeding Program <br />labor1 $ 73 S 73 $ 73 <br />Operations20ffice 11 11 11 <br />and Data <br />Rawinsonde 10 10 10 <br />Ground-based seeders 7 7 7 <br />Seeding Aircraft 0 0 40 <br />Rem::>tely-controlled 3 0 47 0 <br />lIOuntaintop seeders <br />Seeding P.eimbursables 4 26 29 56 <br />Living Allowance 8 8 8 <br />5 4 4 4 <br />Travel <br />Reports 1 1 1 <br />Sub-Total $147 $190 $217 <br />'lbtal with loading * $198 $256 $292 <br /> <br />1) Labor costs include one rnan-ilDnth for evaluation and reporting. <br /> <br />2) These costs could be avoided if itans were supplied by Salt River Project. <br /> <br />3) Costs are for four seeders. Installation and raroval costs are included. <br /> <br />4) Reimbursables include seeding agent, operator payments, aircraft flight, <br />tine, and pilot costs. <br /> <br />5) Ground-based netv"Qrk installation, maintenance, and r€!1Oval. <br /> <br />*Includes Q\.'erhead, G & A and Fee. <br /> <br />3-31 <br /> <br />I <br />