Laserfiche WebLink
<br />PERSONNEL <br /> <br />La Plata West Water Authority: <br /> <br />The LPWWA was formed to manage the development of the La Plata West Rural Domestic <br />Water Supply System. The Board of Directors was appointed by the La Plata Water <br />Conservancy District and the Animas La Plata Water Conservancy District (the entities <br />sponsoring the LPWWA formation). The LPWWA Board members bring extensive <br />experience in water management, as detailed in the attached LPWWA Board Resume <br />Summary. <br /> <br />Under the management of the LPWWA, the following personnel are/will be retained to assist <br />in the project: <br /> <br />Legal Counsel: <br /> <br />Floyd L. Smith, Attorney at Law <br /> <br />Consultant: <br /> <br />Bikis Water Consultants, LLC <br /> <br />Design-Build Team: <br /> <br />A qualified, licensed design-build team will be retained to design and build the intake <br />structure, and provide basic design for the water treatment plant and associated <br />infrastructure (i.e. road, electricity, etc.). The design-build team will be responsible for <br />retaining sub-contractors to perform site studies, engineering design and construction work. <br />Proposals from two teams have been received by LPWWA and are being reviewed. <br />Information on the selected firm and preliminary design proposals and cost estimates will be <br />available mid-March (see Appendix C). <br /> <br />Other: <br /> <br />The U.S. Bureau of Reclamation has provided assistance in sponsoring the feasibility study, <br />engineering design for the intake structure, and project permits. They will continue their <br />collaboration with the LPWWA on this project, which is located on federal land. <br /> <br />The La Plata County Board of County Commissioners is assisting in the coordination of <br />project development with local residents and Tribal governments. Other public and private <br />entities are expected to contribute, in-kind, to the progress of this project. <br /> <br />LPWW A - Scope of Work, Timeline, Budget, Deliverables, Personnel <br />WSRA Statewide Grant Application <br /> <br />2/27/2008 <br />Page 17 <br />