Laserfiche WebLink
CONCEPTS FOR BASIN EVALUAT ION AND PRIORITIZ A TION <br />The follow i ng w ill be used to evaluate a project submitted to the Southw estern <br />Colorado Basin Roundtable: <br />Required: <br />A. Projects m u st be subm itted on an application form used by the State IBCC and <br />Form Submitted <br />CW CB. <br />All applicable sections m u st be com p leted. <br />B. Projects m u st address the values encom p assed by the SW Basin Bylaws, especially <br />the following goals and objectives: <br />For engineering <br />Seek the involvem e nt of all interested parties and stakeholders. <br />and surveying, the Tow n of Saw p it, is just seek ing support from the Basin <br />Round Tables. The Tow n plans to seek out additional funding partners for <br />the construction phase. <br />Propose m e thods or projects, both structur al and non-structural, for m eeting any <br />This project <br />f u ture needs as well as utilizing any unappropriated waters. <br />addresses the future needs for grow th w i thin Tow n of Saw p it and enables the <br />tow n to use its w a ter rights. <br />Prom ote the protection, conservation, and use of water in the Southwestern <br /> This project is for an existing community and w ill <br />Colorado Roundtable area. <br />make the tow n ’s w a ter system more efficient by reducing w a ter loss. <br />Prom ote the socio-econom ic sustainab ility of the Southwestern Colorado <br />This project supports a hist oric community of w o rking <br />Roundtable area. <br />families. <br />Prom ote the protection and conservation of the natural environm ent, including the <br />This small community is located in the San Miguel <br />protection of open space. <br />River Canyon. Construction of the di stribution system w ill be implemented <br />in a w ay as to protect the natural environment. By improving an existing <br />community w a ter system, w e are not contributing to spraw l and new <br />subdivisions. <br />C. Provide the financial details of the pl an, including cost sharing and other possible <br />funding sources. Give a financial overvie w and rough tim eline for com p letion of the <br />A budget is included w i th the application, engineering and surveying w o uld <br />project. <br />be completed 2008, w i th construction anticipated for spring 2009. <br />14 <br />