My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Grand County Stream Flow Mgmt Plan Phase III_Application II (3)
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Grand County Stream Flow Mgmt Plan Phase III_Application II (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 2:31:14 PM
Creation date
3/13/2008 3:20:44 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Colorado
Applicant
Grand County
Description
Grand County Stream Flow Management Plan - Phase III
Account Source
Basin
Board Meeting Date
5/21/2008
Contract/PO #
150461
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />Scope of Work <br /> <br />surveyed cross section information for developing a comparative assessment of the river <br />sections relative to each other and relative to changes over time. <br /> <br />3.4.3 Master Plan Drawings <br /> <br />Develop and prepare design to 35% level of detail for the selected restoration. Specific tasks to <br />be performed for each proj ect area are described below. <br /> <br />~ Prepare base maps using the aerial photos from Phases land 2 and superimposing the cross <br />sectional surveys and information from PHABSIM surveys. <br /> <br />~ Identify goals and techniques to achieve the desired restoration outcome and develop concept <br />details for design. This task includes consideration of improvements for the purpose of <br />habitat improvements, diversion improvements, and reconstruction for increasing depth of <br />flows under low flow conditions. <br /> <br />~ Prepare plan view, profile, and typical section engineering drawings as appropriate that <br />illustrate the general location, extent, and configuration of design components. <br /> <br />~ Using the hydraulic analyses prepared in task 3.4.2 determine the fmal channel cross section, <br />slope and conveyance. Determine flooding potential for the lOO-year event for the proposed- <br />project conditions. The purpose of this analysis is to evaluate the impacts of the proposed <br />restoration and to insure the restoration does not cause flooding of existing structures and <br />roads under proposed-project conditions that might not be occurring under existing <br />conditions. <br /> <br />~ Identify staging areas, temporary work areas, disposal area, construction roads etc. <br /> <br />~ Identify utilities impacted by the designs. <br /> <br />~ Address the potential permitting requirements. <br /> <br />~ Develop quantity estimates for the selected plan. <br /> <br />~ Document the design methods and criteria used. <br /> <br />~ Prepare a narrative describing the project area design components. Discuss the types and <br />quantities of design materials, including vegetation. <br /> <br />~ Prepare conceptual construction cost estimates <br /> <br />~ Coordinate with the County to identify required easements. <br /> <br />3.5 Report Documentation and Recommendations. . . TIns taskmwillillcluderecoillluendations <br />final design and implementation of proposed restoration components. This task for will also <br />include a preliminary cost analysis for services and a conceptual cost analysis for construction. <br /> <br />Stream Management Plan <br />TETRA TECH <br /> <br />~ <br /> <br />Grand County, Colorado <br />TETRA TECH <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.