My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Bauer Lakes Dam Outlet Upgrade_Water Activity Summary
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
SOUTHWEST & YAMPA
>
Southwest - Bauer Lakes Dam Outlet Upgrade_Water Activity Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2013 10:58:35 AM
Creation date
3/13/2008 2:36:14 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Bauer Lakes Water Company
Description
Bauer Lakes Water Company Dam Outlet Structure Upgrade
Account Source
Basin
Board Meeting Date
3/19/2008
Contract/PO #
10000000084
WSRA - Doc Type
Water Activity Summary Sheet - CWCB Evaluation/Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Issues/Additional Needs: <br />? <br /> <br />The applicant notes that they will contract with an engineering firm to complete this project, and that <br />specific awarding of the project is awaiting approval of funding. <br />? <br /> <br />There is no detailed budget as required by the criteria and guidelines (this must include rates, unit <br />costs, level of effort etc.). <br />? <br /> <br />There is no detailed schedule as required by the criteria and guidelines. <br />? <br /> <br />The applicant states that their overall budget of $109,700 is based on estimates provided by Harward <br />Irrigation Systems. Please provide these estimates. <br />? <br /> <br />Since the WSRA application is only funding a portion of the overall project, the applicant should <br />identify which tasks (or portions of tasks) are being funded with the WSRA grant. <br /> <br /> <br />Staff Recommendation: <br />The proposed project will help improve the operations of a local agricultural water project. Staff <br />recommends approval of up to $40,000 from the Southwest Basin Account to complete the Bauer Lakes <br />Water Company Dam Outlet Structure Upgrade contingent on resolution of the items in the issues/additional <br />needs section. <br /> <br />All products, data and information developed as a result of this grant must be provided to CWCB in hard <br />copy and electronic format as part of the project documentation. This information will in turn be made <br />widely available to Basin Roundtables and the general public and will help promote the development of a <br />common technical platform. <br /> <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.