My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Las Animas Sanitary Sewer System Improvements_Water Activity Summary
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Las Animas Sanitary Sewer System Improvements_Water Activity Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2009 12:02:59 PM
Creation date
3/13/2008 2:31:55 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
City of Las Animas
Description
City of Las Animas Sanitary Sewer System Improvements
Account Source
Statewide
Board Meeting Date
3/19/2008
WSRA - Doc Type
Water Activity Summary Sheet - CWCB Evaluation/Approval Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
city. Based on the fact the neighboring correctional facility is in the middle of an expansion coupled with the <br />projected population increase, the city’s corresponding water demands will increase. Increases are expected <br />to jump to 546,700 gpd for an average day demand while the maximum day demand is anticipated to <br />increase to 1,157,200 gpd by year 2030. This increase results in a water shortage gap for the city in both of <br />its raw and treated water systems. <br /> <br />The City of Las Animas has undertaken a comprehensive Preliminary Engineering Report (PER) evaluating <br />its wastewater system, specifically focusing on the collection system and the associated lift stations and force <br />mains servicing the city. The study was expanded to cover the wastewater treatment plant (WWTP) as a <br />result of the local correctional facility’s proposed expansion that will more than double its capacity. When <br />the correctional facility reaches its inmate expansion capacity, the added wastewater loadings on the WWTP <br />will not be detrimental as a result of the facility’s available capacity. <br /> <br />However, the study did reveal critical needs throughout the collection system and lift stations. The city’s <br />main lift station was determined to be in need of replacement due to deteriorating conditions of the wet well, <br />the influent and effluent piping extending underneath the adjacent railroad property and tracks, and the need <br />to move the lift station to the north side of the railroad right-of-way. In addition to the city’s main lift station, <br />the city’s north lift station is also in need of repair. Repairs include lining the concrete wetwell, installing <br />controls and alarms, a new auto-dialer, chart recorder and a new magnetic meter. The lift station <br />improvements in addition to the installation of a refrigerated composite sampler at the wastewater treatment <br />plant comprise Priority No. 1’s improvements. <br /> <br />The vast majority of the collection system appears to have been installed in the early 1900s and consists of <br />vitrified clay pipe with brick and mortar constructed manholes. The components of the system programmed <br />for replacement contain 12-inch, 10-inch and 8-inch diameter piping. There are several of these segments <br />that require quarterly, semiannual and annual attention in the form of jet rodding. The jet rodding typically <br />produces large pieces of roots in addition to numerous pieces of broken clay pipe. <br /> <br />The review also defined the most problematic collection system segments where structurally failing VCP <br />exists together with extremely flat grades, reverse grades and low spots resulting in significant ongoing <br />sludge accumulations and substantial root intrusions. Those segments incorporated into the study’s priority <br />list represent the most severe of the city’s overall collection system. Several additional segments not <br />included in the listing also warrant replacement, but are not incorporated as a result of realistic budget <br />limitations. Priority Nos. 2 through 9 are those segments that pose the potential of actual structural failure <br />and represent significant maintenance obligations on the part of the community. The project consists of <br />replacing those segments of the city’s sanitary sewage collection system that fall in the Priority No. 2 <br />through 4 recommended work. In the event project funds are available to accomplish additional work, added <br />segments will be incorporated for replacement in the order of their prioritization contained within the study. <br /> <br />In addition, one of the priorities contained within the study is the removal of accumulated biosolids within <br />Cell No. 1 of the treatment facility. The project includes replacing several sections of the city’s sanitary <br />sewer collection system, rehabilitating the existing north lift station, replacing the South lift station and <br />installing a refrigerated composite sampler at the wastewater treatment facility. <br /> <br />The initial work will consist of Priorities 1 through 4. The hope is that additional replacement work can be <br />undertaken to address the additional severe problems that exist within the system. The specific goals of the <br />project include: <br />1. Reduce the amount of infiltration and exfiltration from the sanitary sewer mains thereby enhancing ground <br />water quality and increasing water quantity. <br /> 2 <br />