My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WMOD00306
CWCB
>
Weather Modification
>
DayForward
>
WMOD00306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:35:03 PM
Creation date
3/11/2008 11:21:41 AM
Metadata
Fields
Template:
Weather Modification
Project Name
Sierra Cooperative Pilot Project
Title
Sierra Cooperative Pilot Project - Operations Plan - 1986-1987
Date
10/1/1986
Weather Modification - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />provided during the 1030 standup briefing as necessary each operational day or <br />as requested by the Site Director to support intensive aircraft and ground- <br />based data collection and seeding activities. This briefing time can be mod- <br />ified by mutual agreement between the forecaster and the Site Director to <br />accommodate changing weather conditions. The forecasting of expected seedable <br />conditions necessary for the conduct of randomized seeding experiments will be <br />of primary importance (See special forecast exercise in Section II-C). Status <br />reports and daily activities will be communicated via a daily 1100 conference <br />call between all project participants. <br /> <br />The checkpoint at 1800 will be used to notify the Site Director of the likeli- <br />hood of an early morning flight the following day. If no flight is antici- <br />pated, a more informal evening call between Forecaster B and the Site Director <br />wi 11 be requi red at 2100 every eveni ng as requested by the Site Di rector. <br />This will be for planning the next days operation or coordinating flights <br />after 0700 but before 1000. If an evening fl ight is being conducted no <br />evening calls will be required. If an early morning flight is called for, <br />Forecaster A will confirm the decision at 0300 by initiating a wake-up call to <br />the Site Director and Aircraft Seeding Coordinator. They will notify the <br />respective crews to the days activities. If a second flight is possible on a <br />given day, Forecaster A will provide an informal briefing to the Site Director <br />between 0900 and 1100 to determine the type of mission to be f10wn. <br /> <br />The Rhea orographic QPF (Quantitative Precipitation Forecast) model has been <br />adapted for use in the SCPP us i ng the topography for the central Si erra. <br />Excerpts from this adaptation will be employed as an objective aid in pre- <br />paring quantitative precipitation forecasts for the project area. Output will <br />also aid in forecasting conditions that may require suspension of project <br />seeding activities. <br /> <br />11-4 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.