Laserfiche WebLink
Bijou Irrigation District <br />East Embankment Dam Repair <br />January 30, 2008 <br />Page 2 of 2 <br />c) Design/Construction: You must adhere to the CWCB Design and Construction <br />Administration Procedures. Tim Feehan will contact you regarding this phase of the <br />process. Tim will make construction site visits, which will be the basis of pay estimates <br />for disbursement of your loan funds. You can contact Tim Feehan at his desk at <br />(303)866.3480 or cell phone (303)618.5010. <br />On behalf of the Board, I would like to thank you for your interest in a loan from the Colorado Water <br />Conservation Board. <br />Sincerely, <br />~, �P <br />� � �.�1 ,�� �L� <br />Mil�e Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Attachment: Updated Board Memo <br />E-mail Copy (Including Attachments) <br />� <br />��,.�,/��,�' ,� . <br />�` � � �' <br />�� ' <br />, �. <br />��'� <br />. <br />Anna Mauss, P.E., Loan Feasibility <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Eric Wilkinson, Board Member — CWCB, South Platte River Basin <br />Denice Wagner, Secretary, Bijou Irrigarion District <br />Tara Schutter, Applegate Group, Inc. <br />Amy Stengel, AGO <br />CWCB Finance Section Staff <br />