My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150259 Approval letter
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150259 Approval letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 3:38:45 PM
Creation date
3/4/2008 10:55:16 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150259
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
: :� <br />STATE OF COLORADO <br />Colorado Wa�er Conservation B�ard <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />Fax: (303) 866-4474 <br />www.cwcb.state.co.us <br />January 30, 2008 <br />Mr. Donald Neb, President <br />Bijou Imgation District <br />P.O. Box 972 <br />229 Prospect Street <br />Ft. Morgan, Colorado 80701 <br />RE: Empire Reservoir East Embankment Dam Repair <br />Dear Mr. Neb: <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />DNR Executive Director <br />Jennifer L. Gimbel <br />CWCB Director <br />Dan McAuliffe <br />CWCB Deputy Director <br />I am pleased to inforrn you that on January 23, 2008 t�e Colorado Water Conservation Board (CWCB) <br />approved your loan request for Empire Reservoir East Embankment Dam Repair. The Board <br />approved a loan not to exceed $2,408,850 ($2,385,OO1� for project costs and $23,850 for the 1% Loan <br />Service Fee) with loan terms of 2.25% per annum for 30 years. Please note that the loan is conditioned <br />upon District's electi��n and voter approval of debt. ]: have attached a copy of the updated Board <br />memo that includes tY�e Board's approval. <br />When the Board approves a loan there remain several conditions: <br />a) Loan reasibility Studv: Anna Mauss has reviewed the study titled "Empire Reservoir <br />East Embankment Dam Emergency REpair Feasibility Study, November 29, 2007 ". <br />Modifications may be requested by Ms. Mauss via phone/fax or email in the next couple <br />weeks. The approved study, in combination with the CWCB Board Memo revised <br />January 30, 2008, will meet the require,ments of the CWCB Water Project Loan <br />Program Guidelines for loan feasibility studies. <br />b) Contracting: An approved contract mizst be in place before funds can be disbursed. <br />VaugYm MeWilliams will initiate the loan contracting process for this project. When all <br />of the contract conditions are met and the contract is executed the District may request <br />loan funds to cover eligible project expenses. You can contact Vaughn at <br />(303)�366.3462 regarding the requirements. <br />Water Supply Protection • Watershed Protection & Flood Mitigation • Stream & Lake Protection • Water Supply Planning & Finance <br />Water Conservation & Drought Planning • Intrastate Water Management & Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.