During excavation of the borrow material at the project site, the Contractor encountered
<br />significant subsoil moisture. This required the placement of geogrid material along the haul
<br />road to stabilize the road surface, which significantly improved the productivity of the haul
<br />trucks. This resulted in an added cost to the project of $13,788. In order to prevent long term
<br />erosion problems at the outlet, the Company elected to extend the outlet pipe to provide a better
<br />downstream flow alignment. This resulted in an added cost to the project of $3,200.
<br />Remobilization
<br />The delay in receiving SEO approval and the subsequent loss of five critical working weeks on
<br />the Mesa created a situation that the Company, Contractor, and Engineer did not want to have to
<br />address. Given the high moisture content of the borrow material, it became imperative for the
<br />Contractor to have long warm days to assist in drying the material. The late start date resulted in
<br />shorter days, cooler nights, and less ability for the Contractor to work the material to achieve the
<br />desired moisture content and density. In October 2008, it became obvious to the Company,
<br />Contractor, SEO, and CWCB staff that the project could not be completed, and a winter
<br />shutdown plan was submitted to SEO.
<br />In the fall of 2008, the Company negotiated a new contract with the Contractor to complete the
<br />project. It was based on time and productivity lost due to the delay in plan approval, the need to
<br />do extensive unplanned work on the relining of the reservoir outlet (pursuant to a SEO approved
<br />change order) and the need and commitment of both the Company and Contractor to finish the
<br />project. Given those factors the Company negotiated a new contract to complete the project for
<br />a revised contract price of $850,000 or an increase of $100,000.
<br />Table 1 below is a comparison of the original construction cost presented in September 2004, the
<br />revised cost estimated presented at the January 2007 Board Meeting, and the actual project
<br />costs.
<br />Table 1
<br />Original Est. Revised Est. Actual Costs
<br />Construction Items Res.1,2 & 4 Enlarge Res. 4 Enlarge Res. 4
<br />Se t.2004 Jan.2007 Se t.2009
<br />l. Plannin n.lPermits/Water Ri hts $183,000 $157,000 $432,000
<br />2. Construction $477,100 $984,000 $990,000
<br />3. Mobilization $0 $0 $125,000
<br />4. Submittals $0 $0 $2,000
<br />5. Filter Drain/Cutoff/Drain Mat'1. $0 $0 $108,000
<br />6. Ri Ra $0 $0 $137,000
<br />7. Dam Embanlanent $0 $0 $410,000
<br />8. Tce Drain $0 $0 $10,000
<br />9. Outlet Work $0 $0 $103,000
<br />10. S illwa $0 $0 $90,000
<br />11. Instrumentation/Reve . $ $0 $5,000
<br />12. Contin enc $0 $137,000 $20,000
<br />13. Construction Mana ement $0 $55,000 160,000
<br />Totals: $660,000 $1,333,000 $1,602,000
<br />*The total,presented in column three for construction is the summation of items 3 through 11.
<br />4