Laserfiche WebLink
<br />Acknowledgements <br /> <br />Gauthiere Engineering, Inc. would like to thank the Southside Reservoir <br />Company for the valuable assistance during the preparation of this report. <br />Special thanks are offered to Mr. John Whiteside, President of South Side <br />Reservoir Company, Mr. Steve McMillan, Treasurer of South Side Reservoir <br />Company, Mr. Jon Stephens, Secretary of South Side Reservoir Company, Mr. <br />Henry Hetzel of South Side Reservoir Company, Mr. John Van Sciver, P.E., <br />Colorado Water Conservation Board (CWCB) and Mr. Jim Dubler, P.E., State <br />Engineers Office (SEO) for their time and efforts on this project. Mr. Ed A. Toms, <br />P. E. is acknowledged for his study - South Side Dam Hydrologic Assessment, <br />March 9, 2002, which is referred to in this feasibility study. <br /> <br />3 <br />