Laserfiche WebLink
<br />also holds 2 storage decrees allowing a refill of the reservoir, totaling an <br />additional 654 acre-feet. <br /> <br />G. FIELD INVESTIGATIONS <br /> <br />Project photographs taken by South Side Reservoir Company Board members and <br /> <br />Gauthiere Engineering Inc. are included in Appendix A. <br /> <br />Field investigations were conducted in March, 1984 by others and results are <br /> <br />described in a report dated April 9, 1984 by Davenport/Hadley, Ltd. and is included <br /> <br />in Appendix E. <br /> <br />An elevation survey of dam cross sections was conducted by Henry Hetzel and <br />other SSRC Board on Jan. 4, 2003. <br /> <br />Additional field investigations including survey, subsurface investigation and <br />television inspection of the existing outlet will be required for final design. <br /> <br />17 <br />