My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150195 Budget for Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150195 Budget for Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2011 8:20:20 AM
Creation date
3/3/2008 3:30:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150195
Contractor Name
Lower Sacramento Creek Reservoir Company
Contract Type
Loan
Water District
23
County
Park
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />COST ESTIMATE FOR FEASIBILITY ASSESSMENT AND LINER DESIGN <br />OF THE LOWER SACRAMENTO CREEK RESERVOIR NEAR FAIRPLAY, COLORADO <br /> <br /> <br />Assumptions: <br />1. There are no Corps of Engineers or 404 permit issues with which to contend on the project. <br />2. Endangered species are not impacted by the proposed reservior maintenance or operation. <br />3. There are no jurisdictional dam issues associated with the reservior and embankments. <br />4. Zoning and public hearing representation are beyond the scope of the cost estimate. <br />5. Improvement of channels outside the pond embankment will not be required. <br />6. The seasonal high static groundwater level is a minimum 01 two leet below the design bottom elevation 01 the reservior. <br />7. An existing topographic map suitable for design is available for the site. <br /> <br />0210-05 costest.xls <br />10/14/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.