Laserfiche WebLink
<br />- <br /> <br />e <br />KRW CONSULTING, INC. <br /> <br />- <br /> <br />October 14, 2002 <br /> <br />Lower Sacramento Creek Reservoir Company <br />2525 S. Wadsworth Blvd., #306 <br />Denver, CO 80227 <br /> <br />Attention: Mr Bill Blatchley <br /> <br />Subject: Cost Estimate for Feasibility Assessment and Design of Liner System and Reservoir <br />Improvements for Lower Sacramento Creek Reservoir near Fairplay, Colorado <br />KRW Consulting, Inc. Project No.: 0210-05 <br /> <br />Dear Mr. Blatchley: <br /> <br />As you requested, I have prepared a budget for the feasibility assessment and design of improvements to <br />the subject reservoir. Our design budget as proposed is $14,H\6 to include the following tasks: <br /> <br />1. Inspect the existing reservoir conditions to assess necessary improvements. <br />2. Excavate, sample and log five test pits in the existing impoundment to determine the existing soil <br />conditions and the availability and types of soil and rock for construction of reservoir <br />improvements. Two composite samples are proposed for analyses for pertinent geotechnical <br />properties. <br />3. Survey the test pit locations and augment the existing topographical information at critical <br />locations such as reservoir inlets and spillways. <br />4. Assess technical feasibility of lining the reservoir and select an appropriate lining methodlmaterial <br />based on site conditions, material cost, construction cost and acceptable reservoir seepage rates. <br />5. Prepare design documents for earthwork in and around the reservoir to include liner foundation <br />construction, embankment construction and armoring, and inlet and outlet construction. <br />6. Prepare design documentation to facilitate use, placement, anchoring and covering of a the <br />selected liner for the reservoir to reduce seepage from the reservoir. <br /> <br />The project deliverable will be our design report including all field, laboratory and survey information; <br />design rationale, drawings and a construction quality assurance/quality control plan. <br /> <br />We have identified several limiting assumptions used in preparing our cost estimate and included them on <br />the cost estimate sheet. However, if these assumptions do not prove valid, we are willing to provide <br />additional engineering services based on our unit rate structure. The cost estimate is for budget planning <br />purposes only. We propose to bill you on a time-and-materials basis; therefore, ifthe cost for completing <br />the project is less than estimated, you will be billed accordingly and vice versa. <br /> <br />Thank you for the opportunity to serve you on this project. If you have questions regarding the scope of <br />work or cost estimate as defined herein, please feel free to call me. <br /> <br />Regards, <br /> <br />~ e. ~-- <br /> <br />Kip R. White, PE <br />President, KRW Consulting, Inc. <br /> <br />Attachment: <br /> <br />cost estimate <br /> <br />8000 W. 14th Avenue, Suite 200 · Lakewood, Colorado 80214 . (303) 239-9011 · Fax (303) 239-0745 <br />