Laserfiche WebLink
<br />Task 3 - Conducting a site visit and preparing reconnaissance-level designs and <br />cost estimates for improving the Lone Cabin Ditch and Reservoir system. <br /> <br />The results of Task 1 and 2 are summarized in this report. The results of Task 3 are <br />provided in Appendix C of this report. <br /> <br />Authorization <br /> <br />The work summarized in this report was authorized by the Town of Paonia in an <br />agreement between the Town and W. W. Wheeler and Associates, Inc. (Wheeler) on <br />January 23, 2001, Some of the information provided in this report was prepared as <br />part of the Draft 2000 Study prepared by GEl Consultants, Inc. (GEl). Wheeler has <br />summarized this information with the permission of, GEl, Paonia, and the CWCB staff. <br /> <br />Proiect T earn <br /> <br />The project team responsible for preparing this report includes: <br /> <br />Stephen L. Jamieson, P.E., Project Manager, Wheeler <br />Paul Perri, E.!., Staff Water Resources Engineer, Wheeler <br />Stephen T. Labonde, P.E., President, WestWater Engineering (WestWater) <br />Michael Klish, Senior Environmental Scientist, WestWater <br /> <br />We are grateful to the following individuals who provided valuable input and <br />review to this report: <br /> <br />Mr. Robert Johnson, Mayor, Town of Paonia <br />Mr. Ron Rowell, Former Mayor, Town of Paonia <br />Mr. John Norris, Town Manager, Town of Paonia <br />Mr. Bruce Johnson, CWCB <br />Mr. Mike Serlet, CWCB <br /> <br />2 <br />