My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01952 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01952 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:35 AM
Creation date
3/3/2008 2:45:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150131
Contractor Name
Paonia, Town of
Contract Type
Loan
Water District
0
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />INTRODUCTION <br /> <br />Study Obiective <br /> <br />The original of this report was to document the technical, financial, and <br />institutional aspects of the first step in improving the raw water supply system owned <br />and operated by the Town of Paonia (Town or Paonia). This report was prepared to be <br />consistent with the Colorado Water Conservation Board's (CWCS) guidelines for <br />,feasibility reports, but has been written ,to document a master plan approach for <br />improving Paonia's water supply system. <br /> <br />This report was finalized in February 2004 to reflect revisions to the report <br />required to support a CWCS loan to the Town for the purchase of water rights in the <br />form of a repurchase and retirement of 317 unused out-of-town water taps associated <br />with the Ark Land property, Although the CWCS approved the loan on January 23, <br />2003, Paonia subsequently declined to accept the loan because the Town could not <br />reach a final agreement on the water rights purchase with the Ark Land Company. <br /> <br />This report was finalized in February 2004 so that the Town could receive the <br />$10,000 CWCS grant that was authorized for this report. The data documented in this <br />report reflects information that was available at the time the draft report was prepared <br />in June 2002. No attempt was made to update information in this report to reflect the <br />post-June 2003 data. <br /> <br />Scope of Work <br /> <br />The scope of work summarized in this report includes: <br /> <br />Task 1 - Facilitated a public meeting and workshop to review the previously <br />completed draft report and solicit public input to the water supply study. <br /> <br />Task 2 - Revised the previously completed draft water supply study prepared by <br />GEl Consultants, Inc. in April 2000 (Draft 2000 Study). <br />
The URL can be used to link to this page
Your browser does not support the video tag.