My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01950 (3)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01950 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:16 AM
Creation date
3/3/2008 2:38:55 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0078FX
Contractor Name
Blue Lake Owners Association
Water District
0
County
Eagle
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- ~ <br /> <br />Agenda Item 17b. <br />November 24, 1997 <br />Page 2 <br /> <br />(Updated December 3, 1997) <br /> <br />BLOA wants to protect their existing irrigation water right by putting it to beneficial use. <br /> <br />The system will cost $1.2 million to construct, or about $3500 for each of the 35Q homeowners. <br />The $900K CWCB loan will have a payment of about $60,000 per year ($17~ per year per <br />household or $14 per month per household), and the Association would have to fund $300K in <br />cash ($850 per household.) The Association is seeking a grant from another sourde to help fund <br />their $300K portion for the project. <br /> <br />The average yearly residential water bill for potable water is expected to remain (airly constant, <br />once the new raw water irrigation system is installed. The raw water irrigation s~stem will cost <br />the homeowners an additional $14 per month in assessments paid to their Association, once the <br />one-time fee of $850 per household has been paid. Operation and maintenance co~ts for the new <br />system are expected to be paid from the current $45 per month assessment. The].~e will also be <br />the added advantage that the new system will allow irrigation of portions of parks a,nd open space <br />that were previously either not irrigated, or irrigated with hauled water at great expense. <br />I <br /> <br />The new irrigation system will have a capacity sufficient to irrigate ~ 31 acres, i,vith a rotation <br />schedule that allows watering every other day. The system will provide about 400 62 acre feet of <br />water per year for irrigation. ! <br /> <br />The service area for the BLOA is primarily residential, and lies generally 7 miles! north-west of <br />Basalt, about 1 mile west of El Jebel, and about 6 miles south-east of Carbondale. All these <br />, <br />towns had a Median Household Income that was greater than 110% of the Statewide MHI for <br />1990. A loan to the BLOA should thus be at the "High Income" rate for a municip'ality, to be set <br />i <br />by the CWCB on November 24, 1997. <br /> <br />The Association has had an initial homeowners meeting to discuss the project, anc.l its cost. The <br />Homeowners were in favor of the project. A formal vote is set for December 4, 11997, at which <br />time the Association is seeking consent to borrow, and to raise assessments by $14 per month to <br />cover debt repayment. <br /> <br />BLOA has scheduled construction to start in spring 1998, so that the project can be: completed by <br />fall 1998. A portion of the project will be constructed by the time CWCB Staff can complete the <br />lending contract, about July 1998. A loan to the Association should allow refinancihg of portions <br />of the project already completed. ! <br /> <br />COLLATERAL <br /> <br />, <br />I <br />The BLOA receives monthly assessments from its Association members. The CWq:B will take a <br />security interest in this stream of revenues. The BLOA can also pledge water rights: as collateral. <br />
The URL can be used to link to this page
Your browser does not support the video tag.