My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01935 (3)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01935 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:06:26 AM
Creation date
2/26/2008 12:28:44 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150144
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The UPBCC, according to State Engineer records found in appendix <br />A, diverts on average approximately 30,000 acre feet of water per <br />year for irrigation and approximately 2,500 acre feet for <br />augmentation. The UPBCC has lots of room for additional <br />diversions under their decree. The 1972 UPBCC augmentation decree <br />sets a maximum diversion for augmentation at 12,000 acre feet far <br />greater than their average diversion. <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $75,000. Project planning <br />and engineering design will be provided by Brent Nation of Nation <br />Engineering Services, LLC. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs <br />2. Construction Cost with Contingency <br /> <br />$ 5,000 <br />$70,000 <br /> <br />Total Cost <br /> <br />$75,000 <br /> <br />A more specific cost break down is as follows: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Dam Construction (2 total) <br />2. Outlet Pipe (2 total) <br />3. Slide Gate (2 total) <br />4. Concrete Headworks (2 total) <br />5. Slurry for dam cutoff (20 cu yds) <br />6. Convert ditch turnout (lump sum) <br />7. End of system weir (4 total) <br />8. Clock and recorder (5 total) <br />8. Contingency <br />9. Planning ~nd Design Costs <br /> <br />Total Cost <br /> <br />$27,000 <br />$ 3,600 <br />$ 4,400 <br />$ 3,000 <br />$ 1,100 <br />$ 8,000 <br />$ 6,000 <br />$10,000 <br />$ 6,900 <br />$ 5,000 <br /> <br />$75,000 <br /> <br />Feasibility Study <br />Upper Platte and Beaver <br />Badger Creek Aug Project <br />. April 2003 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.