My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01941 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01941 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:16 AM
Creation date
2/26/2008 11:05:47 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150126
Contractor Name
Kremmling, Town of
Contract Type
Loan
Water District
50
County
Grand
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />U.V. Disenfection and Filtration Svstem 1 LS $0 $0 <br />Controls, MCC's, Electrical and Lightning 1 LS $40,000 $40,000 <br />Protection <br />Mechanical Systems 1 LS $10,000 $10,000 <br />Water Measurement Svstems 1 LS $8,000 $8,000 <br />Drain Piping 1 LS $2,000.0 $2,000 <br /> 0 <br /> Total $300,000 $900,091 <br />Item 5-12" HOPE "High Lift" <br />Forcemain <br />HOPE Forcemain 7,460 LF $41.09 $306,531 <br />ARV's 1EA $5,000 $5,000 <br />EnerQY Dissipators 1 EA. $1,000 $1,000 <br /> Total $312,531 $1,212,623 <br />Subtotal of Construction Costs $1,122,79 <br /> 9 <br />Item 6-Proiect Demobilization <br />Demobilization @ 1 % of Subtotal of 1 LS $11,228 $11,228 $1,223,851 <br />Construction Costs <br />Miscellaneous Construction $183,578 $1,407,428 <br />Continaencies @15% <br />Engineering - Design Phase Services $112,594 $1,520,023 <br />@8% <br />Engineering - Bid & Construction $56,297 $1,576,320 <br />Phase Services @ 4% <br />Primary Electric Power Service 1 LS $40,000 $40,000 $40,000 <br />Estimated Total Project Costs $1,616,320 <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.