Laserfiche WebLink
<br />Appendix H <br /> <br />TOWN OF KREMMLlNGIGRR * SUPPLEMENTAL WATER SUPPLY * ESTIMATE OF <br />PROBABLE PROJECT COST <br /> <br /> Installed Installed Cumulative <br /> Unit Item <br />Item Quantity Unit Cost Cost Total <br />Item 1-Mobilization & General <br />Requirements <br />Mobilization @ 8% of Subtotal of 1 LS $89,824 $89,824 $89,824 <br />Construction Costs <br />Item 2-ILow-Lift" Pump Station <br />Access Road 7,000 LF $2.50 $17,500 <br />Improvements at Colorado River, 1 LS $75,000. $75,000 <br />includina Bank Stabilization 00 <br />Self-Cleaning Screen, Pump System and 1 LS $10,000. $10,000 <br />Pump Pioina 00 <br />Piping to Wetwell 1 LS $10,000. $10,000 <br /> 00 <br />Slide Gate 1 EA $3,000 $3,000 <br />Concrete Wetwell 1 LS $30,000 $30,000 <br />Submersible Pumps wI Check Valves 3 EA $20,000 $60,000 <br />and Slide Rail Svstem <br />Aluminum Checker Plate for Pump 3 EA $1,000 $3,000 <br />Access <br />Wetwell Access Manhole and Steps 1 LS $1,000 $1,000 <br />6" Gate Valves 3 EA $1,500 $4,500 <br />6" Flanaed DIP Piping and FiUinas 1 LS $10,000 $10,000 <br />Controls, MCC's, Electrical and Lightning 1 LS $30,000 $30,000 <br />Protection <br /> Total $254,000 $343,824 <br />Item 3-12" HOPE Low Lift Forcemain <br />HDPE Forcemain 5,750 LF $41.09 $236,268 <br />Culvert Sleeves 1 EA. $10,000 $10,000 <br />ARV's 1 EA. $5,000 $5,000 <br />EnerQV Dissipators 1 EA. $1,000 $1,000 <br />14" Gate Valves 2 EA $2,000 $4,000 <br /> Total $256,268 $600,091 <br />Item 4-IHi-Lift" Station <br />Concrete Wetwell 1 LS $70,000 $70,000 <br />Excavation and Backfill 1 LS $10,000 $10,000 <br />Architectural Buildina Treatments 1 LS $40,000 $40,000 <br />Vertical Turbine Pumps 3 EA $20,000 $60,000 <br />Soft Start Drive 3 EA $6,000 $18,000 <br />Pump Control Valves 3 EA $7,500 $22,500 <br />6" Knife Gate Valves 3 EA $1,500 $4,500 <br />6" Flanaed DIP Pipina and Fittinas 1 LS $15,000 $15,000 <br /> <br />11 <br />